My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9127 BARING WAY 2025-03-25
>
Address Records
>
BARING WAY
>
9127
>
9127 BARING WAY 2025-03-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 10:26:51 AM
Creation date
12/28/2022 11:46:42 AM
Metadata
Fields
Template:
Address Document
Street Name
BARING WAY
Street Number
9127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 1 <br />12/7/2022 17:11 <br />Issued By BRP BIGLEY, RYAN P. <br />Issued DeparlmentPW PUBLIC WORKS <br />Date Issued 121N2021 <br />Fund 401 Accounts Program 710 Function 11s Activity 075 <br />Program <br />Tide REPAIRS INCH 9127 BARING WAY 71011 W75 <br />Work Order No 20211598 Prefect Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 1202M Time 05:e6 Original WO Billing <br />Customer Information <br />Customer Name <br />Address <br />Street <br />Apartment No <br />City <br />State <br />Zip <br />Subdivision <br />Phone No ( 1 - <br />Ext <br />Second Phone ( 1 - <br />Ext <br />E-Mail Address <br />Problem Information <br />Address 9127 <br />Street BARING WAY <br />From Cross Street <br />To Cross Street <br />City <br />Subdivision <br />Map Book <br />Problem WATER WATER <br />Sub Problem OTHER OTHER <br />Requested By <br />Agency <br />Initiated From <br />Utility Locate (USA) No Called Date <br />Assignment Information <br />Dept <br />Crew <br />Contractor <br />Assigned To <br />Assigned By <br />Customer If <br />Change Map YIN <br />Zip <br />Map Reference <br />Date Requested <br />Related Request <br />Expiration Date <br />Priority Estimated Hours <br />Assigned Data To Be Camp Date <br />Scheduled Date Scheduled Time <br />Route Route Sequence <br />Comments INVENTORY IN THE MOUNT OF$251.10 JOURNALNEO IN 2022, <br />Action Taken INSTALLED NEW.76 INCH SETrER AND METER BGx. <br />Recommended Action <br />Approved By <br />Job Cost Information(V/N) <br />Start Date I I Time Date Completed <br />12M2022 Permit No <br />Completed By Time <br />Follow Up? <br />
The URL can be used to link to this page
Your browser does not support the video tag.