My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
409 VERALENE WAY SW 2023-04-11
>
Address Records
>
VERALENE WAY SW
>
409
>
409 VERALENE WAY SW 2023-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 11:12:18 AM
Creation date
12/30/2022 1:42:22 PM
Metadata
Fields
Template:
Address Document
Street Name
VERALENE WAY SW
Street Number
409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Inspections <br />V E R E T T City of Everett <br />WASHINGION <br />Permit Number: M2210-002 <br />Description: GAS FURNACE AND TANKLESS WATER HEATER WITH GAS <br />PIPING <br />Applied 20/1212022 Approved: 10/24/2022 Site Address: 409 VERALENE WAY SW <br />Issued: 10/17/2022 Finaled: 11/29/2022 City, State Zip Code: EVERETT, WA 98303 <br />Status: FINALED Applicant WASHINGTON ENERGY SVCS CO LLC <br />Parent Permit Owner: HEINTZ THOMAS G 1R 8, MARLENE A <br />Parent Project: Contractor: WASHINGTON ENERGY SVCS CO LLC <br />Details: <br />GAS PIPING <br />LIST OF INSPECTIONS <br />SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br />MECHPWMB <br />MECH O6-FINAL <br />eTPANiT Inspection Request <br />N3PECT00. <br />Notes: <br />11/16/202210:18 AM WASHINGTON ENERGYSVCS CO LLC <br />Contact Name: WASHINGTON ENERGY WCS CO LLC <br />Site Address : 409 VERALENE WAY SW <br />Phon@:2063786648 <br />e-Mail: PERMn@WMHINaONENERGY.COM <br />11/22/2022 <br />11/22/2022 <br />MECHO6FINAL <br />I IMON <br />APPRVD-PERMIT <br />see notes <br />MORRISSEY <br />FINAL <br />Notes: <br />11/161202210:32 AM WASHINGTON ENERGY SVCS CO LLC <br />Contact Name: WASHINGTON ENERGY SVC$ CO LLC <br />Site Address : 403 VERALENE WAY SW <br />Phone: 2063786648 <br />e.Malk PERMI6@WASHINGTONENERGY.COM <br />- New names tankless high effidencygas Furnace. <br />11/22/2022 <br />11/22/2022 <br />GA501-ROUGH IN <br />IASON <br />APPROVAL <br />see notes <br />MORRISSEY <br />Notes: <br />- Rough gas pipe ok. Test or m 15 PSI. <br />11/22/2022 <br />ll/22/2022 <br />GAS 03-FINAL <br />IMON <br />APPRVD-PERMIT <br />M0RRISSEY <br />FINAL <br />Notes: <br />�h <br />Printed: Friday, 16 December, 2022 1 Of 1 rz, <br />SUPERIOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.