Laserfiche WebLink
Attn: James Bronder, associate engineer, plans reviewer 3-14-22 <br /> Re: Plan Check# M2201-083 IECIEOVIESonrise Christian Center 11625 Airport Road, STE D <br /> MAR 2 1 2022 <br /> CITY OF EVERETT <br /> Response to correction notice#1 Permit Services <br /> (1) As requested, structural load calculations have been completed and attached with this <br /> resubmittal package. <br /> (2) The Mechanical drawings have been revised to reflect the change, which involved <br /> relocating MUA-1 to Grid line 6 where it sets above a column. Changes are identified <br /> with bubble notes on M-1 and M-2 <br /> (3) Also included is an 8-page submittal for the Fire Wrap Insulation. <br /> James, please let me know if you have any questions. <br /> Thanks for your help. <br /> Bill Alsept bill@williams-mechanical.com 425-754-8759 <br /> Williams Mechanical <br /> 2 COPIES OF M 012/ l'NGy <br /> . z CAD OF 5-11-"TIOt CAIC1 <br /> • 2 CO /e5 61: ARp 141V .54911t1A <br /> • 1 c( f or 43P'N3r Lett. <br />