Laserfiche WebLink
410 <br /> Intake &Approval Sheet 40 (FOR PERMIT STAFF ONLY) PERMIT# K'7 03 _ 6®C° <br /> BUILDING PLANNING <br /> • <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> • <br /> ❑ Route to Commercial Building ❑Attach to Project No: <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a"W"Permit ❑ OK to Route to Other Departments <br /> Bldg/TI/Addn/Rem Size ❑ Hold in Planning File Drawer _ <br /> Garage/Accessory Struct.Size Zone <br /> Number of Stories Overlay/Agreement <br /> Basement ❑No ❑Yes, Fin/Unfin Nonresidential Use <br /> Type of Construction Residential Use <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupancy Load Total No.of Dwelling Units: _ <br /> Fire Sprinklers: El Update Existing ❑New System ❑Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu"Fee:Type: Amount$ <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑Everett School Dist ❑Mukilteo School Dist <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No Additional Notes: <br /> VALUATION CALCULATION: Total$ <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Intake OK by: . Date: <br /> Additional Notes: Intake Comments: IPW IPvv Worksheet Needed if: <br /> ❑Sys Dev Eval ❑Traffic Mit Eval <br /> IDSite Work or Drainage Proposed <br /> Approved By: Date: ❑Backflow Prevention for high hazard: <br /> • :(dental,medical,animals,mortuary,hospital, <br /> _supportive housing) <br /> FIRE DEPARTMENT El Route this folder for PW Review at end ---PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: f This Permit is Approved by Public Works <br /> 0 See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: 0 A Separate PW Permit is Required(Permit#:PW <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> ig Review/Inspection Scope-ADD FIRE FEE ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ,Approved By:\<tR.C6 t,U c Date: / �� 0 Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL €AA. `A�tt''�'`°"" p�?nrw,'.E-r' 418('7.Lr <br /> Additional Notes: <br /> Approved By: Date: Approved B Date: <br />