Laserfiche WebLink
WAC 29646B-900: ELECTRICAL PLAN REVIEW <br />JTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box neat to (a) <br />City Staff if plan review is not required and select the box next to the specific reason from WAC 296.46B-900. If plan review <br />tilde, select the box next M (b) and (c) to acknowledge that plan review Is required and the electrical plans have been <br />If hem (a)-fil, III, or v) la selected, the work must also comply with section (a)i See arrow flow chart below. <br />3) Electrical plan review. <br />❑� (a) Electrical plan review is not required for <br />❑ (i) Low voltage systems; <br />�❑ (i) Lighting specific projects that result in an electrical load reduction on each feeder involved in Me project <br />❑ Oil) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br />involved in the project, provided there is not a corresponding increase in Me available fault current in any feeder. <br />❑ (w)Stand-alone utility fed services that do not exceed 250 volts 400 amperes where Me projects distribution <br />system does not include: <br />(A) Emergency systems other than listed unit equipment per NEC 700.12(F). <br />(B) An essential electrical system defined in NEC 517.2; or <br />(C) A required fire pump system. <br />ai (v) Modifications to existing electrical installations where all of the following conditions are met: <br />(A) Service or distribution equipment involved is rated hot more than 400 amperes and does not exceed <br />250 volts or for lighting circuits not exceeding 277 volts to ground; <br />(B) Does not involve emergemi systems Other than listed unit equipment per NEC 700.12(F); <br />(C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC <br />517.2; and <br />(D) Service or feeder load calculations are increased by 5%or less. <br />(v) Electric power production source(s) such as solar photovoltaic, fuel coal, or wind electric system(s) with a total <br />El <br />rating of 9600 wads or less. <br />❑ (vll) For Installations In (a)(II), (III), and (v) of this subsection to be considered, the following must be <br />available W the elecMGal Inspector before the work is initiated <br />(A) A clear and adequate description of the project's scope: <br />(B) A load calculation(s); <br />(C) What the load changes are, providing both before and after panel schedules as needed: am <br />(D) Provide information showing that the service and leaders) supplying the panel(s) where the work is <br />taking place has adequate capacity for any increased load and has code compliant overcurrent <br />protection for that supply. <br />NOTE: Electrical plan review is not required for "Medical, dental, and chiropractic dinic' of which is a clinic or <br />❑ physidans' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br />(1)(c)(4). <br />❑(b) Electrical plan review is required for all other new Or altered electrical projects in educational, institutional, or health care <br />occupancies defined in this chapter. <br />(c) If a review is required, the electrical plan must be submitted for review and approval before Me electrical work is begun. <br />hotel <br />house or Personal over Pension, <br />hole, <br />Maneuverer <br />it"i <br />Auto "it <br />Asolutudire.grAlle, <br />van <br />Prwan, almenflurn hospital <br />Plan <br />idi hole <br />red <br />Enhanced v,rvile filter <br />Y" <br />Taid, hi <br />Educartional and linstitutional hadlifiel Plandes of Assembly, or Other Founded <br />ludwathani Pronounced. or <br />Plan handle <br />Yes <br />I Muratori <br />Yes <br />all to TLMa a00A add all <br />1. A say auWrized In do fell n5darriond; <br />may morne plan mew an ptlllry word nat <br />MNMtd thythe deWrtmenc <br />PE/AtITA Pop 2~ Whew <br />