Laserfiche WebLink
I <br /> 5I ill- o/5 <br /> ll- o15 <br /> I <br /> Harris Group Inc. <br /> I Project No. 12630.06 <br /> I <br /> Structural Calculations <br /> I <br /> for <br /> I <br /> I Boeing Building 40-058 <br /> Everett, WA <br /> I PFP Spar Paint Booth 1 and 2 <br /> I Boeing Job No.: W5983281 <br /> IContents: Professional Engineers Seal <br /> I <br /> • Narrative <br /> • Support Space- Design Criteria and <br /> Reactions ego M. $ <br /> I . Support Space - Base Plate Design y�� of wAskr`Q� <br /> • Support Space - Column Anchorage Design ,�/� .j= o <br /> • Trench Foundation Design 'Fdr/ �' <br /> I <br /> • Trench Grating and Grating Design <br /> • Tooling Cart Track and Support Design ��'��,4'��sTER�'�tiwir <br /> • Paint Booth 1 and 2 - STAAD Foundation �'Q`SIONAL � 10/25/2019 <br /> I Model and Analysis <br /> • Paint Booth 1 and 2 - Reinforcement <br /> Anchorage Design <br /> 1 <br /> 1 Harris Group Inc. <br /> Project Manager: Ron Thirtyacre 2601 4th Avenue, Suite 400 <br /> Seattle,WA 98121 <br /> 1 Design Engineer: Kyle Witt (206)494-9400 <br /> (206)494-9500 FAX I <br /> www.harrisgroup.com <br /> Check Engineer: Alex Warner <br /> IDate Issued: 10/23/19 Harris Group <br /> I <br />