Laserfiche WebLink
PT <br /> CITY OF EVERE <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Ivan Rybachuk/Mark Gosnold <br /> PROJECT NAME: 40-58 Spar Paint SUPPORT SPACE & NORTH WALL <br /> LOCATION (BLDG/FLR/COL): 40-58, 1st, A 4.0 <br /> PROJECT TIMELINE&PERMIT NEED DATE: 11/28/19 <br /> MAXIMO JOB#: W5983281/W6244941 <br /> CHARGELINE(s)#: 66=1514005=DTLCAP661677X5=CIPLOP8X=X=CD=C600=699 <br /> 66=1514005=DTLCAP661677X5=CIPLOP8Z=X=CD=C600=699 <br /> CONTRACT PRICE OF WORK BEING $6,817,597.00 <br /> PERMITTED: <br /> CONTRACTOR NAME: Hoffman Construction <br /> CONTRACTOR E-MAIL Stephen-Hoback@hoffmancorp.com <br /> CONTRACT STATE LISC#: HOFFMCC164NC <br /> CONTRACTOR CITY OF EVERETT LISC#: 41705 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: - New rooms for paint mixing, paint storage,changing rooms <br /> (Do not include electrical and mechanical - Mechanical platform on bump out roof to house HVAC <br /> scope and costs. Contractors will secure equipment <br /> these permits) - Material lift supporting support spaces <br /> - Stairs to support space roof level to service HVAC <br /> equipment <br /> - North wall Openings and framing supporting HVAC <br /> equipment <br /> - Structural steel supporting paint booths HVAC equipment <br /> (Note: Ductwork for Par/Durr HVAC Equipment under <br /> separate permit) <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1) site plan, (4)full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.j.haberlack@boeing.com <br />