My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 7 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br /> ' Specifications and Drawings are divided into groups for convenience. These divisions are not for the <br /> purpose of apportioning Work or responsibility for Work among Subcontractors, Suppliers and <br /> manufacturers. The Contractor is responsible for all Work shown or described,regardless of location(s) <br /> ' in the Contract Documents. <br /> 2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br /> 2.3.1. Errors and Omissions <br /> If the Contractor,in the course of the Work,becomes aware of any errors or omissions in the Contract <br /> Documents or in the Owner's field work,he or she shall immediately inform the Owner's Representative <br /> in writing. The Owner's Representative will promptly review the matter and if he or she finds an error or <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> accordingly. If the corrective work associated with an error or omission significantly increases or <br /> ' decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission,related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications,or that are customarily <br /> performed,shall not relieve the Contractor from performing such omitted or misdescribed details of the <br /> Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. <br /> 2.3.2. Conflicting Provisions <br /> ' Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br /> general drawings. In the event an item of Work is described differently in two or more locations on the <br /> Drawings and in the Specifications,the Contractor shall,upon request of the Owner's Representative, <br /> submit in writing to the Owner's Representative the description upon which the Contractor relied in <br /> preparing its Bid or laying out the Work. If the Owner's Representative directs the Contractor to perform <br /> Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br /> Work,Change Order procedures will be followed. In this event,the Contractor shall submit to the <br /> ' Owner's Representative such supporting information,including bidding or layout documents,as may <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract Sum is <br /> increased,decreased or unchanged by the Change Order. <br /> I <br /> 1 <br /> I <br /> 00 72 00 - 7 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.