My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 15 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 4.4.9. Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible obstruction to Traffic and <br /> inconvenience to the general public,business,organizations and residents in the vicinity of the Work and <br /> to reasonably protect persons and property. No roads or street shall be closed to the public except with <br /> ' the permission of the Owner's Representative and the proper governmental authority. Fire hydrants on or <br /> adjacent to the Work shall be accessible to fire fighting Equipment. Temporary provisions shall be made <br /> by the Contractor for the use of sidewalks,private and public driveways and proper functioning of gutters, <br /> sewer inlets,drainage ditches and culverts,irrigation ditches and natural water courses. <br /> 4.4.10.Access to Work <br /> Owner,Owner's Representative,their consultants and other representatives and personnel of Owner, <br /> independent testing laboratories,and governmental agencies with jurisdictional interests will have access <br /> to the Site and the Work at reasonable times for their observation,inspecting,and testing. Contractor shall <br /> provide them proper and safe conditions for such access and advise them of Contractor's Site safety <br /> procedures and programs so that they may comply therewith as applicable. <br /> 4.4.11. Emergencies <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent <br /> thereto,Contractor is obligated to act to prevent threatened damage,injury,or loss. Contractor shall give <br /> Owner's Representative prompt written notice if Contractor believes that any significant changes in the <br /> Work or variations from the Contract Documents have been caused thereby or are required as a result <br /> thereof.If Owner's Representative determines that a change in the Contract Documents is required be- <br /> cause of the action taken by Contractor in response to such an emergency,a Work Change Directive or <br /> Change Order will be issued. <br /> 4.4.12. Trench Excavation <br /> For all trench excavations that exceed a depth of four feet,the Contractor must use adequate safety <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act,chapter 49.17 <br /> RCW. <br /> 4.4.13 'COVID-19 Requirements <br /> The Contractor shall be in compliance at all times with all governmental laws,regulations,requirements, <br /> and orders relating to COVID-19 applicable to the Work,including without limitation OSHA,L&I or <br /> other safety rules relating to COVID-19 and COVID-19 gubernatorial proclamations and orders. These <br /> laws,regulations,requirements,and orders are referred to as"COVID-19 Requirements." <br /> Contractor's Bid includes all costs necessary for the duration of the Work for compliance with COVID-19 <br /> Requirements. Contractor's Bid takes into account that COVID-19 Requirements may create direct and <br /> indirect costs,including inefficiency and delay. <br /> Contractor shall have no entitlement to an adjustment or other increase to the Contract Sum for any direct or <br /> indirect costs(including without limitation delay,cumulative impact,inefficiency or ripple costs)incurred <br /> by the Contractor to comply with COVID-19 Requirements. <br /> I <br /> I <br /> 00 72 00 - 15 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.