IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 17 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> If requested by the Contractor,the Owner will arrange meetings with other contractors performing work <br /> on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br /> of the planned activities of other contractors and will coordinate its work with the other contractors. <br /> Contractor shall notify the Owner of problems,interference or any difficulty with other contractors or <br /> workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br /> Owner to mitigate or avoid increased costs,time of performance,damages or injury. Contractor's failure <br /> to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br /> Claims relating to,arising out of,or caused by,any alleged interference,difficulty or problem with <br /> another contractor or worker engaged by the Owner. <br /> 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED <br /> Following execution of the Contract by the Owner,the Owner or Owner's Representative will give the <br /> Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract,the Contractor <br /> shall not be obligated to perform Work,and the Owner will not be obligated to accept or pay for Work <br /> performed by the Contractor or be liable for any Delays,prior to delivery of the Notice to Proceed. The <br /> Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br /> the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum and Contract Time arising out of,or related to,work it performs prior to <br /> receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. <br /> 5.2. CONTRACT TIME <br /> 5.2.1. General <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br /> Project within the contractually specified time may affect other Projects and Owner activities.Contract <br /> Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br /> Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br /> Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br /> accordance with thl Contract Time period. Contractor shall perform its work at such times and in such <br /> ways that the Work is not damaged by weather such as wind,rain,or snow. Contractor shall correct or <br /> repair at its sole expense any Work damaged by weather, irrespective of whether such damage is covered <br /> by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br /> while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br /> Work,Contractor agrees the contractually required completion dates are feasible,reasonable,and <br /> achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br /> price and achieving the Completion Dates,including,but not limited to,weather, Site access,labor <br /> conditions and the availability of materials, supplies and Equipment. Compliance with ARTICLE 10. <br /> NOTICE TO OWNER,ARTICLE 12. CONTRACT CLAIMS,and 5.2.2. Construction Schedule <br /> are conditions precedent to a request for,consideration of,and grant of,any extension of Contract Time. <br /> Failure to request a time extension in the manner and in the time required by this section,and the <br /> Specifications referred to herein,constitutes a waiver by the Contractor of any and all entitlement to an <br /> extension of time and any adjustment of Contract Sum arising out,or related to, such Delay. <br /> 5.2.2. Construction Schedule <br /> 5.2.2.1 General <br /> Contractor shall submit,update and maintain schedules as required by the Contract Documents. <br /> I <br /> 00 72 00 - 17 GENERAL CONDITIONS <br />