Laserfiche WebLink
I <br /> City of Everett 00 72 00 - 21 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 12. If Contractor performs Work which deviates from the Contract. <br /> 13. If Contractor otherwise violates in any material way any provisions or requirements of the <br /> Contract. <br /> After termination of the Contractor for default,the Owner may transfer performance of the Work to the <br /> Contractor's surety. The Owner may exclude the Contractor from the Site and take possession of the <br /> Work and all of the Contractor's tools,appliances,owned or rented construction equipment,and <br /> machinery at the Site and use the same to the full extent they could be used by the Contractor. The <br /> Owner may incorporate in the Work all materials and Equipment stored at the Site or for which the <br /> Owner has paid the Contractor,but which are not yet on Site. In such case,the Contractor will not be <br /> entitled to receive any further payment until the Work is finished. At the Owner's sole option,Contractor <br /> shall assign and transfer any contractual rights to material and Equipment to be installed,incorporated,or <br /> used in the performance of the Work. Owner shall credit Contractor for the reasonable fair market rental <br /> value of any and all Contractor owned equipment for so long as retained and used by the Owner. Owner <br /> shall credit Contractor for all materials and supplies on Site or on order,but not yet paid for by Owner, <br /> provided that ownership is transferred and assigned to the Owner and the materials and supplies conform <br /> to the requirements of the Contract Documents. <br /> If the unpaid balance of the Contract Sum exceeds the direct and indirect cost of the completed Work, <br /> including construction management services,such excess shall be paid to the Contractor. If such costs <br /> exceed such unpaid balance,the Contractor shall pay the difference to the Owner. Such costs incurred by <br /> the Owner will be verified by the Owner's Representative and incorporated into a Change Order,but in <br /> finishing the Work,the Owner may negotiate for materials,Equipment and services to complete the Work <br /> and will not be required to obtain the lowest figure for Work performed. <br /> Where the Contractor services have been so terminated by the Owner,the termination shall not affect any <br /> rights of the Owner against the Contractor then existing or which may thereafter accrue. Any retention or <br /> payment of monies due the Contractor by the Owner will not release the Contractor from liability. <br /> ,. If the Owner terminates this agreement for default,and it is thereafter determined that the Contractor had <br /> not so failed to perform its obligations or defaulted in any way,the termination shall then be deemed to <br /> have been made for the convenience of the Owner pursuant to 5.4.2 Termination For Convenience. In <br /> that event,any adjustment of Contract Sum shall be in accordance with the General Conditions. <br /> The Contractor covenants and agrees that in the event suit is instituted by the Owner for any default on <br /> the part of the Contractor and the Contractor is adjudged by court of competent jurisdiction to be in <br /> default,the Contractor shall pay to the Owner all costs,expenses expended or incurred by the Owner in <br /> connection therewith. <br /> In exercising the Owner's right to prosecute the Physical Completion of the Work,the Owner shall have <br /> the right to exercise its sole discretion as to the manner,method,and reasonableness of the costs of <br /> completing the Work.In the event that the Owner takes Bids for remedial Work or Physical Completion <br /> of the project,the Contractor shall not be eligible for the Award of such Contracts. <br /> 5.4.2. Termination for Convenience <br /> Without prejudice to any other remedy it may have under law or and/or the provisions of the Contract,the <br /> 1 Owner may terminate this Contract for convenience,with or without cause, in whole or in part,at any <br /> time by giving written notice to the Contractor. Termination will be effective upon receipt of such Notice <br /> by the Contractor. The Contractor shall immediately discontinue Work and take all reasonable steps with <br /> its suppliers and subcontractors to minimize cancellation charges and other costs. <br /> In the event of termination for convenience,the Contractor shall be compensated as provided in 9.2.3. <br /> Deleted Work.The Contractor will be entitled to no further payments whatsoever for the Work. <br /> I <br /> 00 72 00 - 21 GENERAL CONDITIONS <br />