IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 33 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> In special circumstances where a particular item of equipment is placed in continuous service before <br /> Substantial Completion of all the Work,the correction period for that item may start to run from an earlier <br /> date if so provided in the Specifications. <br /> Where defective Work(and damage to other Work resulting there from)has been corrected or removed <br /> 1 and replaced under this Paragraph 8.10,the correction period hereunder with respect to such Work will be <br /> extended for an additional period of one year after such correction or removal and replacement has been <br /> satisfactorily completed. <br /> Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation,guarantee or <br /> warranty.The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a waiver of <br /> the provisions of any applicable statute of limitation or repose. <br /> 9. MEASUREMENT AND PAYMENT <br /> 9.1. PAYMENTS TO CONTRACTOR <br /> 9.1.1. Schedule of Values <br /> The Contractor shall submit a Schedule of Values at least fifteen(15)days prior to submitting its first <br /> Application for Payment. If the Project contains Unit Price Work, in whole or in part,then the Schedule <br /> of Values for that portion of the Work shall also be based on unit prices. If the Bid form calls for a lump <br /> sum price,in whole or in part,then the Schedule of Values shall:reasonably allocate the Contract Sum <br /> among the various portions of the Work;be complete;be organized to include detailed breakdown of each <br /> major unit of the Work;be organized to correspond to Contractor's schedule;break down the Contract <br /> Sum showing the value assigned to each part of the Work; include an allowance for profit and Overhead; <br /> include Unit Price Work,if and to the extent indicated on the Bid form;be so organized as to facilitate <br /> assessment of work and payment of Subcontractors;and be balanced. To the greatest extent possible,the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating the cost allocation if asked by the Owner's Representative. Upon <br /> acceptance of the Schedule of Values by the Owner's Representative,it shall be used as a basis for all <br /> requests for payment. <br /> 9.1.2. Progress Payments <br /> j9.1.2.1 Payment Request Procedures: <br /> By the tenth day of each month,or by schedule mutually agreed upon in writing by the Contractor and <br /> Owner's Representative,the Contractor shall submit to the Owner's Representative a partial payment <br /> estimate filled out and signed by the Contractor covering acceptable Work performed during the previous <br /> month,or since the last partial payment estimate was submitted. Contractor's submission of a progress <br /> pay estimate constitutes a material representation by the Contractor that it performed all of the Work <br /> described in the progress pay estimate during the relevant time period in a workmanlike manner and that <br /> the materials for which payment is requested reasonably conform to the Specifications and are either on <br /> the job Site or have been installed. If requested by the Owner's Representative,the Contractor shall <br /> provide such additional data as may be reasonably required to support the payment estimate. Such data <br /> may include satisfactory evidence of payment for Equipment,materials and labor including payments to <br /> Subcontractors and Suppliers. Certified invoices by the Suppliers shall accompany a request for payment <br /> for delivered Equipment and material. Such Equipment and material shall be suitably and safely stored at <br /> the Site of the Work. Payment requests shall summarize accepted operating and maintenance material <br /> with request for Equipment payment. A progress payment is preliminary only. By making a progress <br /> payment,the Owner does not waive or release its right,nor is it estopped from asserting,that previous <br /> progress payments were not earned or were in error,whether in whole or in part. <br /> I <br /> 00 72 00 - 33 GENERAL CONDITIONS <br />