My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 38 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 9.4. COMPENSATION TO OWNER FOR TIME EXTENSION <br /> The Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, 1 <br /> inspection,general supervision,right-of-way costs,permit fees,Overhead expenses,and any other <br /> ascertainable direct costs to the Owner that are directly chargeable to the Work and which accrue during <br /> the period of such extension. The actual costs do not include charges for final inspection and preparation <br /> of the final payment by the Owner. <br /> 9.5. ADJUSTMENT OF CONTRACT SUM <br /> 9.5.1 Calculation <br /> Except as otherwise expressly provided in these General Conditions,any and all adjustments of Contract <br /> Sum shall be determined as follows: <br /> 1. If the parties are able to agree,the price will be determined by using: <br /> a. Unit prices, if the Work items are defined by unit prices;and <br /> b. Other prices agreed upon by the Contractor and Owner for Work not defined by unit prices. <br /> 2. If the parties cannot agree,the Owner's Representative will determine the price pursuant to the <br /> following order: <br /> a. Unit prices, if the Work items are defined by unit prices;and <br /> b. Other means to establish the reasonable cost of the Work if it is not defined by unit prices, <br /> including,but not limited to,Force Account as described in 9.6.FORCE ACCOUNT,the <br /> Schedule of Values,or estimating manuals. <br /> 9.5.2 Limitations <br /> The following limitations shall apply in determining the amount of an adjustment: i <br /> 1. Except as otherwise expressly provided,Contractor will only be paid for costs it clearly and <br /> convincingly proves it actually and directly incurred,and shall not include consequential or indirect <br /> damages not otherwise expressly permitted by the Contract Documents. Costs and damages for <br /> which Owner shall not be liable under any circumstances include,but are not limited to:(a) <br /> borrowing or interest costs,charges,or expenses of Contractor;(b)alleged lost profit or Overhead <br /> on any other project;and(c)Contractor's failure or inability to obtain other work. <br /> 2. No Contract Claim for adjustment of Contract Sum or additional compensation for extra,affected, <br /> impacted or inefficient Work will be allowed where the Contractor does not keep and maintain <br /> contemporaneous,complete and accurate time records for labor and equipment and <br /> contemporaneous,complete and accurate records for materials and where such records do not <br /> contemporaneously segregate and allocate by time,location and work the time and costs for each <br /> item or element of such work.Contractor's failure to keep and maintain such records constitutes a <br /> waiver of any Contract Claim or request by the Contractor for adjustment of Contract Sum for such <br /> costs or event. <br /> 3. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any Delay or 1 <br /> extension of Contract Time,Contractor shall be compensated as provided in 12.4 REMEDIES. <br /> Such compensation shall be full,adequate and complete compensation for all direct,indirect, <br /> cumulative,inefficiency,impact and ripple costs causing,arising out of,or relating to such delays <br /> or extension. <br /> I <br /> I <br /> 00 72 00 - 38 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.