My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 56 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 1 <br /> 15.3.14.1 CGL <br /> A policy of Commercial General Liability Insurance,written on an insurance industry standard <br /> occurrence form: (CG 00 01)or equivalent,including all the usual coverage known as: <br /> - Per Project aggregate endorsement(CG2503) <br /> - Premises/Operations Liability ' <br /> - Products/Completed Operations—for a period of one year following Final Acceptance. <br /> - Personal/Advertising Injury <br /> - Contractual Liability <br /> - Independent Contractors Liability <br /> - Stop Gap or Employers Contingent Liability <br /> - Explosion,Collapse,or Underground(XCU),(as applicable)* <br /> - Liquor Liability/Host Liquor Liability(as applicable)* I <br /> - Fire Damage Legal <br /> - Blasting(as applicable)* <br /> *These coverages are only required when the Contractor's Work under this agreement includes <br /> exposures to which these specified coverage respond. <br /> If the Contract requires working over water,the following additional coverages are required: I <br /> a. Watercraft,owned and non-owned <br /> b. U.S.Harborworkers'/Longshoremen and Jones Act <br /> 15.3.14.2 Builders' Risk <br /> The Contractor shall procure and maintain during the life of the Contract,or until acceptance of the <br /> project by Owner,whichever is longer,"All Risk"Builders Risk or Installation Floater Insurance at least <br /> as broad as ISO form number CP0020(Builders Risk Coverage Form)with ISO form number CP0030 <br /> (Causes of Loss—Special Form)including coverage for collapse,theft,off-site storage and property in <br /> transit.The coverage shall insure for direct physical loss to property of the entire construction project,for <br /> 100%of the replacement value thereof and include earthquake. The policy shall be endorsed to cover the <br /> interests,as they may appear,of the Owner,Contractor and subcontractors of all tiers with the Owner and <br /> sub-contractors listed as a Named Insured.In the event of a loss to any or all of the work and/or materials <br /> therein and/or to be provided at any time prior to the final close-out of the Contract and acceptance of the <br /> project by the Owner,the Contractor shall promptly reconstruct,repair,replace or restore all work and/or <br /> materials so destroyed.Nothing herein provided for shall in any way excuse the Contractor or its surety <br /> from the obligation of furnishing all the required materials and completing the work in full compliance <br /> with the terms of the Contract.. <br /> 15.3.14.3 Other Coverages <br /> Other additional coverages that may be required will be listed in the Specifications. 1 <br /> i <br /> 1 <br /> i <br /> 00 72 00 - 56 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.