My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 21 13 - 13 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> Forms for Submission after Award of Contract <br /> The following forms are to be executed after the award of Contract: <br /> I1. Contract: This Contract to be executed by the successful Bidder in duplicate within <br /> 14 calendar days after the award date. <br /> 2. Payment and Performance Bonds: These forms are to be executed by the <br /> successful Bidder and his surety company in triplicate. The amount of these bonds <br /> shall be 100 percent of the Total Bid and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained <br /> and maintained in force in accordance with SECTION 00 7200, Part 15 "Liability <br /> and Insurance", of the Contract Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must <br /> file with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000)and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br /> the Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract <br /> is over$1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br /> (Affidavit of Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br /> Form WH347 may use State of Compliance found on the back of the form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br /> attach the Statement of Compliance Form WH348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br /> on a form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section 00 7200, <br /> Part 5 "Progress and Completion", of the Contract Documents by the Contractor <br /> within ten calendar days, or such time as determined by the City, after the date of <br /> receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are not <br /> sufficient, complete or adequate to support the Bidder's planned means and <br /> methods of performing the Work, the Bidder must develop an adequate, complete <br /> and sufficient traffic control plan at its cost, that shall be submitted for the City's <br /> approval prior to construction. Deviation from the Standard Plans must be <br /> ' submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The <br /> Contractor shall provide the City with copies of all permits for disposal and storage <br /> of surplus materials within ten calendar days after award of the Contract. <br /> END OF SECTION 00 21 13 <br /> I <br /> 00 21 13 - 13 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.