Laserfiche WebLink
I <br /> City of Everett 00 43 36 - 1 <br /> IWater Filter Plant Portal 4 Improvements WO# 3755 <br /> ISECTION 00 43 36 - PROPOSED SUBCONTRACTORS FORM <br /> 1 . For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> IWork, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of Work <br /> I identified, unless Subcontractors vary with Bid alternates, in which case the Bidder <br /> must indicate which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> IA. For heating, ventilation and air conditioning, plumbing, electrical work, <br /> structural steel installation and rebar installation, Bidder fails: (1) to submit <br /> I as part of the Bid the names of such Subcontractors; (2) to name itself to <br /> perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> I4. The requirement to name the Bidder's proposed heating, ventilation, air <br /> conditioning, plumbing, electrical, structural steel installation and rebar installation <br /> I subcontractors applies only to proposed heating, ventilation, air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors who will contract directly with the general contractor submitting the <br /> IBid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> Ipublished bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the published <br /> 1 bid submittal time. <br /> I Type/Scope of Work Name and Address of Subcontractor or <br /> Bidder <br /> HEATING 5 hAhn YNI\e(./(\arl;c,,4_ <br /> I Subcontractor, bidder or "no work" MUST be \con vp. Ave S . Ke/n+,W A o1�6o3Z <br /> stated <br /> VENTILATION AND AIR CONDITIONING 5V.ihv\ Me,CAnctetiot <br /> ' Subcontractor, bidder or "no work" MUST be tq�Z �o*� {gate S G . <br /> w�} 3Z <br /> stated <br /> PLUMBING (as described in RCW Chap. !ODwO,( <br /> 18.106) <br /> 11 Subcontractor, bidder or "no work" MUST be <br /> stated <br /> I <br /> 00 43 36 - 1 PROPOSED SUBCONTRACTORS FORM <br /> Iovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />