Laserfiche WebLink
I <br /> City of Everett 00 52 13 - 1 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> ' SECTION 00 52 13 -AGREEMENT FORM <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this a"'9 day of NovtNAOLQ , �o , <br /> by and between the City of Everett, Washington, a municipal corporation existing under <br /> the laws of the State of Washington (the "City") and <br /> :MC-0 (,E- pu.C-01r,;Rvc-t‘ , (the "Contractor"). <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants <br /> and agrees to furnish all labor, tools, materials, equipment, and supplies required to <br /> complete in a workmanlike manner the work, improvements, and/or appurtenances in <br /> accordance with the Specifications and Drawings and all other Contract Documents <br /> entitled:4mm Frrr iz Pi-A Pi-AvYT PoR-rAM ,mPRovt-ME►a-iS" (the "Project"). <br /> 1. Contract Documents. The "Contract Documents" are defined in the General <br /> Conditions. The Contract Documents are part of this Contract and are hereby <br /> incorporated by reference. Terms that are capitalized in a Contract Document but not <br /> defined in that Contract Document shall have the meaning defined to them in the other <br /> Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within Two <br /> Hundred Forty (240) calendar days after the effective date of the Notice to Proceed. <br /> Physical Completion shall be within Thirty (30) calendar days after the actual date of <br /> issuance of Substantial Completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages for each and every calendar day (or working day, if Contract Time is <br /> described in working days) in the amounts set forth in this Section. For failure to <br /> achieve Substantial Completion by the Substantial Completion date stated above, the <br /> Contractor shall pay liquidated damages to the City computed at the daily rate of fifteen <br /> percent (15%) of the Contract Sum divided by the number of days of Contract Time <br /> stated above. Once Substantial Completion is achieved, for failure to achieve Physical <br /> Completion by the Physical Completion Date stated above, the Contractor shall pay <br /> liquidated damages at the daily rate of ten percent (10%) of the liquidated damages rate <br /> applicable to delays to Substantial Completion. <br /> I <br /> I <br /> 00 52 13 - 1 AGREEMENT FORM <br /> I <br />