My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 72 00 - iii <br /> Water Filter Plant Portal 4 Improvements Wo# 3755 <br /> 8.1. General 28 <br /> I <br /> 8.2. Product Data 29 <br /> 8.3. Quality 29 <br /> 8.4. Material and Equipment Specified by Name 29 <br /> I <br /> 8.5. Requests for Substitution 29 <br /> 8.6. Demonstration of Compliance with Contract Requirements 29 <br /> 8.6.1. Inspection 29 <br /> 8.6.2. Samples of Materials 30 <br /> 8.6.3. Certification 30 <br /> 8.6.4. Inspection at Point of Manufacturing 30 <br /> i <br /> 8.6.5. Testing and Commissioning of Completed Work 30 <br /> 8.6.6. Storage of Materials and Equipment 30 <br /> 8.6.7. Manufacturer's Directions 31 <br /> I8.7. Defective Work 31 <br /> 8.7.1. Correction of Defective Work 31 <br /> 8.7.2. Retention of Defective Work 31 <br /> I <br /> 8.8. Materials and Equipment Furnished by Owner 31 <br /> 8.9. Guarantee 32 <br /> I 8.10. Correction Period 32 <br /> 9. MEASUREMENT AND PAYMENT 33 <br /> 9.1. Payments to Contractor 33 <br /> I <br /> 9.1.1. Schedule of Values 33 <br /> 9.1.2. Progress Payments 33 <br /> 9.1.2.1 Payment Request Procedures: 33 <br /> ' <br /> 9.1.2.2 Review Procedures. 34 <br /> 9.1.2.3 Retained Percentage 34 <br /> 9.1.2.4 Withholding 34 <br /> 9.1.3. Final Payment 35 <br /> 9.2. Payment for Changes 36 <br /> ' 9.2.1. Changes in Estimated Quantities of Unit Price Work 36 <br /> 9.2.1.1. Increased Quantities 36 <br /> 9.2.1.2. Decreased Quantities 36 <br /> I <br /> 9.2.1.3. Limitations 36 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 36 <br /> 9.2.3. Deleted Work 36 <br /> I <br /> 9.3. Charges to Contractor 37 <br /> 9.4. Compensation to Owner for Time Extension 38 <br /> 9.5. Adjustment of Contract Sum 38 <br /> I <br /> 9.5.1 Calculation 38 <br /> 9.5.2 Limitations 38 <br /> 9.5.3 Unabsorbed and Extended Overhead 39 <br /> I <br /> 9.6. Force Account 39 <br /> 9.6.1 Labor. 40 <br /> I00 72 00 - iii GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.