IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 5 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> Substantial Completion: The day on which the Owner or Owner's Representative determines the <br /> ' Owner has full and unrestricted use and benefit of the Project,from both the operational and safety <br /> standpoints and only minor incidental Work,replacement of temporary substitute facilities,or minor <br /> correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely <br /> ' at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br /> Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> ' Supplier: A manufacturer,fabricator, supplier,distributor,materialman,or vendor having a direct <br /> contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br /> in the Work. <br /> ' Total Float: The amount of time any given activity or path of activities may be delayed before it will <br /> affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians,bicyclists,wheelchairs,and <br /> equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings,or both,due to any reason <br /> whatsoever,including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Bid form. <br /> ' Work: Refers to the Project and the provision of all labor,materials,Equipment, supplies, services,and <br /> other items necessary for the execution,completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS <br /> ' The complete Contract includes the following,which are Contract Documents: <br /> 1. Federal and state requirements that apply to this Contract and Project; <br /> ' 2. Supplemental agreements between Owner and Contractor,if any, subsequent to the Owner's <br /> execution of the Contract and signed by the Mayor of the City of Everett for Owner and by an <br /> authorized representative of Contractor <br /> 3. Change Orders; <br /> 4. Addenda; <br /> 5. The Contract; <br /> 6. Bid Form; <br /> 7. Specifications,including,but not limited to,these General Conditions and other numbered <br /> ' Documents and Sections; <br /> 8. Supplementary Conditions,if any; <br /> 9. Drawings and plans; <br /> ' 10. City of Everett standard plans in effect as of the date Bids are opened,only to the extent that they <br /> are called out in the Contract Documents; <br /> ' 11. Notice to Bidders/Instructions to Bidders;and <br /> 12. Certifications and affidavits as required by this Contract and by law. <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order of precedence in <br /> ' the list above(e.g., 1 presiding over 2,3,4,5,and 6;2 presiding over 3,4,5,and 6; and so forth). This <br /> order of precedence shall not apply when Work is required by one part of the Contract but omitted from <br /> another part or parts of the Contract.The Work required in one part must be furnished even if not <br /> mentioned in other parts of the Contract. <br /> 00 72 00 - 5 GENERAL CONDITIONS <br />