My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9801 21ST DR SE 2022-12-30
>
Address Records
>
21ST DR SE
>
9801
>
9801 21ST DR SE 2022-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 3:36:02 PM
Creation date
12/30/2022 3:35:55 PM
Metadata
Fields
Template:
Address Document
Street Name
21ST DR SE
Street Number
9801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2110-043 Description: Mechanical gas line<5'extension&gas range <br /> Applied: 10/14/2021 Approved: 10/14/2021 Site Address:9801 21ST DR SE <br /> Issued:10/14/2021 Finaled:9/6/2022 City,State Zip Code: EVERETT,WA 98208-3858 <br /> Status:FINALED Applicant:HAMBLEN&SONS HEATING <br /> Parent Permit: Owner:Chris Collison <br /> Parent Project: Contractor: HAMBLEN&SONS HEATING <br /> Details: <br /> Gas pipe to support a new kitchen range <br /> Mechanical gas line<5'extension&gas range <br /> '', <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 7/18/2022 7/18/2022 PERMIT EXTENSION EXTENSION <br /> CINDY BERGSMA <br /> (Reason Required) APPROVED <br /> Notes: <br /> 8/1/2022 8/1/2022 MECH 06-FINAL MASON RESCHEDULE eTRAKiT Inspection Request <br /> MORRISSEY ONLINE <br /> Notes: <br /> JASON <br /> 8/30/2022 8/30/2022 MECH 06-FINAL APPRVD-PERMIT <br /> MORRISRRISSEY FINAL <br /> Notes: <br /> Printed:Tuesday,06 September, 2022 1 of 1 '- <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.