My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 104TH ST SW 2023-01-03
>
Address Records
>
104TH ST SW
>
2024
>
2024 104TH ST SW 2023-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2023 8:45:32 AM
Creation date
1/3/2023 8:45:28 AM
Metadata
Fields
Template:
Address Document
Street Name
104TH ST SW
Street Number
2024
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> July 25, 2022 <br /> CLIFTON HART(/CHRISTA THORNE <br /> 2024 104TH ST SW UNIT A <br /> EVERETT,WA, 98204 <br /> RE: STATUS OF CITY OF EVERETT PERMIT(S) LOCATED AT 2024 104TH ST SW <br /> The permit(s) listed below will expire soon or has expired. <br /> PERMIT NO.: M2103-035 <br /> DESCRIPTION OF WORK: Remove/replace gas water heater <br /> EXPIRATION DATE: 1/15/2022 <br /> CONTRACTOR: FAST WATER HEATER COMPANY <br /> Sections 105.5 of the International Building Code and R105.5 of the International Residential Code state that <br /> permits become invalid if the work is not commenced or is suspended or abandoned for more than 180 <br /> days. <br /> 1. If work is complete, request a final inspection to close out the permit. <br /> 2. If work is continuing, request the appropriate inspection that fits the current construction needs. <br /> 3. If work is currently on hold but work will resume within the next 6 months, request a permit <br /> extension to keep the permit active.The reason for the extension is required to be provided in the <br /> notes field of the permit extension request. <br /> Please request the above inspections and/or permit extension through the Online Permitting Portal at <br /> pw.everettwa.gov. Log in to your account,then find the specific permit number in your dashboard under <br /> either"My Active Permits" at the top or"My Expired Permits" at the bottom. Click the inspection request <br /> link on the selected permit,then request your inspection by selecting an available date,choosing the <br /> appropriate inspection type (permit extension is one of the inspection types), and following the inspection <br /> scheduling instructions. <br /> If no action is taken within 14 days of the date of this letter,the permit record(s)will be closed without <br /> approved final inspection and any work performed will be considered unpermitted work. After the permit <br /> has expired,work under the permit(s)will no longer be authorized unless extension is granted via inspection <br /> or permit extension request.Continuing work after the permit is closed will require a new permit application <br /> and permit fees due to inspect the work not finaled under the original permit. <br /> If you have questions or would like to discuss the status of the permit,contact our Permit Technicians at <br /> PermitServices@everettwa.gov or 425.257.8810, Monday through Friday from 8am to 12pm and 1pm to <br /> 3pm.Thank you for your attention to this time sensitive matter. <br /> Sincerely, <br /> Everett Permit Services <br /> 0 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> 7/25/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.