My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/01/04 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/01/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 3:20:04 PM
Creation date
1/5/2023 10:18:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: Award the contract for 2023 Biosolids Removal to American Process Group, LLC. <br />Council Bill # <br />Agenda dates requested: <br />1/4/23 <br />Briefing <br />Proposed action <br />Consent 1/4/23 <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Bid Summary <br />Department(s) involved: <br />Public Works <br />Contact person: <br />Hanna Lintukorpi <br />Phone number: <br />425-257-8946 <br />Email: <br />hlintukorpi@everettwa.gov <br />Initialed by: <br />2LS <br />Department head <br />Administration <br />Council President <br />Consideration: Recommendation to Award for 2023 Biosolids Removal <br />Project: 2023 Biosolids Removal <br />Partner/Supplier: American Process Group, LLC <br />Location: Everett Water Pollution Control Facility <br />Preceding action: Call for Bids — 11/2/22 <br />Fund: Fund 401— Water & Sewer Utilities <br />Fiscal summary statement: <br />The biosolids project will be paid from Fund 401— Water and Sewer Utility. <br />Bids were opened 12/13/22, the low bid with American Process Group in the amount of <br />$709,420.99. <br />Project summary statement: <br />Biosolids are dredged on an annual basis at the Water Pollution Control Facility from <br />either the Oxidation Pond, Recirculation Channel, or Aeration Cell #2. In 2023, the <br />Recirculation Channel will be dredged, dewatered, then land applied for beneficial use. <br />This contract award will result in approximately 2,000 dry tons of biosolids being <br />dredged and dewatered. <br />Recommendation (exact action requested of Council): <br />Authorize a recommendation to Award for 2023 Biosolids Removal to American Process <br />Groups. <br />
The URL can be used to link to this page
Your browser does not support the video tag.