Laserfiche WebLink
Survey Markers. Grantee shall not destroy any land survey monuments marking local control <br /> points, geodetic control points, and land boundary survey corners without prior written approval <br /> from the landowner,which shall not be unreasonably withheld. Land survey monuments that <br /> must necessarily be disturbed or destroyed during construction or maintenance activities must be <br /> adequately referenced and replaced, at the Grantee's expense,under the direction of a <br /> Professional Land Surveyor, licensed in the State of Washington, in accordance with all <br /> applicable laws of the State of Washington in force at the time of construction, including but not <br /> limited to RCW 58.24, and all Department of Natural Resources regulations pertaining to <br /> preservation of such monuments. As directed under Chapter 332-120 WAC, a Land Surveyor or <br /> Engineer must submit an application with the Department of Natural Resources for permission to <br /> temporarily remove or destroy a survey monument. <br /> Fire Prevention and Control. The Grantee shall be responsible for satisfying the requirements <br /> of the laws of the State of Washington pertaining to Forest Protection and, in addition thereto, <br /> the Grantee shall during the closed season of April 15 through October 15 contact Grantor who <br /> shall determine any extra requirements pertaining to burning procedure, blasting, watchman, <br /> extra patrol,pumpers,tankers, fire hoses, fire tools, etc.,which are deemed necessary for <br /> prevention and suppression of fire which may result from the Grantee's operations. <br /> Indemnity by Grantee. Grantee shall defend, indemnify and hold harmless the Grantor from all <br /> claims that arise out of the negligence of the State or its Permittees in their use of the permit. A <br /> "claim"as used in this section means any financial loss, claim, suit, action, damage, or expense, <br /> including but not limited to attorneys' fees, attributable to bodily injury, sickness, disease or <br /> death, or injury to or destruction of tangible property including the resulting loss of use. <br /> Notwithstanding the foregoing, State's obligation to defend, indemnify, and hold harmless the <br /> Grantor from any judgment, decree or arbitration award shall extend only to the percentage of <br /> negligence of State and its Permittee in contribution to such claim. State waives its immunity <br /> under Title 51 RCW only to the extent it is required to indemnify, defend and hold harmless <br /> Grantor. This indemnification shall survive the expiration or termination of the permit. <br /> Notice. Unless otherwise specified herein, any notices required or permitted under this Permit <br /> may be delivered personally, sent by facsimile machine or mailed certified, return receipt <br /> requested,to the following addresses or to such other place as the parties hereafter direct. <br /> Notice will be deemed given upon delivery or upon confirmation of facsimile, whichever is <br /> applicable. <br /> To State: To Grantor: <br /> DEPARTMENT OF NATURAL RESOURCES City of Everett <br /> Northwest Region 3200 Cedar Street <br /> 919 North Township Street Everett, WA 98201 <br /> Sedro-Woolley, WA 98284 <br /> Page 4 of 13 Road Use Permit No.55-104170 <br />