Laserfiche WebLink
INSPECTION REPORT <br />Date 5/ 10/1-1 Permit: � n ci- - 6�S <br />Contractor: Qa(6w <br />Owner: - <br />Site address: <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑ Temp Service <br />❑ LIFER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Footing <br />❑ Rough In <br />❑ Rough In <br />❑ Slab/Conduit <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />Hough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />rounding <br />❑Insulation <br />❑Mechanical Final <br />❑Medical Gas <br />fling Grid <br />❑Drywall Nailing <br />❑Plumbing Final <br />Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />ITE WORK <br />❑ Roof Nailing <br />❑ Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough in <br />❑ Roof drains <br />❑ Building Final <br />❑ Gas Pipe Final <br />❑ HWT Final <br />_ OTHER OR CONSULTATION: _ ' -9 B <br />e— <br />Ak+ - <br />ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR T.C.O. ❑ CORRECTION REQUESTED L] ❑ <br />OK FOR C.O. El <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24,hour notice required <br />Y <br />Inspector: _ _ Date: <br />E I R (10/06) �. DA ABAR, INC. <br />