Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2205-127 Description: CIRCUIT-PV SOLAR ROOD MOUNT INSTALLATION,6.84 <br /> kW <br /> Applied:5/17/2022 Approved: 5/17/2022 Site Address: 1818 BAKER AVE <br /> Issued:5/23/2022 Finaled: 11/29/2022 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant:ALEXUS PINA <br /> Parent Permit: B2205-054 Owner:COOPER JEFFREY A <br /> Parent Project: Contractor:SOLGEN POWER(ELEC)LLC <br /> Details: <br /> **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> CIRCUIT-PV SOLAR ROOD MOUNT INSTALLATION,6.84 kW <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 8/11/2022 8/11/2022 ELEC 02-GROUND MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WORK WICKLANDER APPROVAL <br /> Notes: <br /> 8/10/2022 1:08 PM SOLGEN POWER(ELEC)LLC <br /> ditch cover <br /> Contact Name:Michael Collins <br /> Site Address:1818 BAKER AVE <br /> Phone:3608601383 <br /> e-Mail:PERMITTING@SOLGENPOWER.COM <br /> (8/11/2022 11:02 AM MHW) <br /> Ground rough in approved <br /> (8/11/2022 11:25 AM MHW) <br /> Under ground rough in approved <br /> (8/11/2022 12:31 PM MHW) <br /> Ground rough in approved <br /> 8/22/2022 8/22/2022 ELEC 05-SERVICE MICHAEL CANCELLED <br /> WICKLANDER <br /> Notes: <br /> Requesting an afternoon inspection <br /> Max 509-362-9530 <br /> (8/22/2022 10:04 AM CRB) <br /> MAX CANCELLED <br /> (8/22/2022 11:28 AM MHW) <br /> Cancelled per Cindy via teams. <br /> I <br /> Printed:Thursday,05 January, 2023 1 of 2 <br /> SUPERION <br />