My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/12/07 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/12/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 2:19:21 PM
Creation date
1/18/2023 2:18:55 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: An Ordinance creating a special improvement project entitled "PGSF Bond Street Combined <br />Sewer Improvements" Fund 336, Program 033. <br />Council Bill # <br />CB 2211 - 53 <br />Agenda dates requested: <br />11/30, 12/7, 12/14 <br />Briefing <br />Proposed action 11/30 & <br />12/7 <br />Consent <br />Action 12/14 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Randy Loveless <br />Phone number: <br />425-257-8825 <br />Email: <br />RLoveless@everettwa.gov <br />Initialed by: <br />R.LS <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Plans & Systems Ordinance <br />PGSF Bond Street Combined Sewer Improvements <br />TBD <br />Port Gardner Storage Facility <br />None <br />336 — Water & Sewer System Improvements Fund <br />Fiscal summary statement: <br />The funding source for this project will be Fund 401 Water and Sewer Utility Fund. The <br />programmed available funding for the design phase is $2,400,000. <br />Project summary statement: <br />This project includes the design and construction of new pipelines, existing manhole <br />retrofits, new regulator/flow diversion structures to divert high wet -weather flows to <br />the Port Gardner Storage Facility (PGSF) instead of to existing overflow outfalls (PS05, <br />PS06, and PS07). <br />This is one of several conveyance projects required for the PGSF program to meet the <br />agreed order with Ecology to reduce overflows by 2027. <br />This ordinance will provide funding for the design phase of the improvement project. <br />Upon completion of design, Public Works will return with a new ordinance that will <br />include construction funding for Council consideration. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special improvement project entitled "PGSF Bond <br />Street Combined Sewer Improvements" Fund 336, Program 033. <br />
The URL can be used to link to this page
Your browser does not support the video tag.