My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/12/07 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/12/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 2:19:21 PM
Creation date
1/18/2023 2:18:55 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: An Ordinance creating a special improvement project entitled "WFP Air Scour Blower Building <br />Replacement" Fund 336, Program 034. <br />Council Bill # <br />CB 2211 — 55 <br />Agenda dates requested: <br />11/30, 12/7 and 12/14 <br />Briefing <br />Proposed action 11/30 & <br />12/7 <br />Consent <br />Action 12/14 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Randy Loveless <br />Phone number: <br />425-257-8825 <br />Email: <br />RLoveless@everettwa.gov <br />Initialed by: <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Plans & Systems Ordinance <br />WFP Air Scour Blower Building Replacement <br />TBD <br />Water Filter Plant <br />None <br />336 — Water & Sewer System Improvements Fund <br />Fiscal summary statement: <br />The funding source for this project will be Fund 401 Water and Sewer Utility Fund. The <br />programmed available funding for the project is $900,000. <br />Project summary statement: <br />This project includes the demolition and replacement of an existing 250 square -foot <br />building located on the south end of the filter building. A new structure will be <br />constructed adjacent to the existing building, which will house two air scour blowers and <br />associated electrical and control components. <br />The air scour blower system agitates water filtration media during the filter backwash <br />process and is a critical component of the filtration system. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a special improvement project entitled "WFP Air <br />Scour Blower Building Replacement" Fund 336, Program 034. <br />
The URL can be used to link to this page
Your browser does not support the video tag.