Laserfiche WebLink
E EVERETT <br />Project title: Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with <br />Aspect Consulting for WFP Waste Landfill Engineering Support services <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />Agenda dates requested: <br />December 07, 2022 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />x No <br />Budget amendment: <br />Yes x No <br />PowerPoint presentation: <br />Yes x No <br />Attachments: <br />Proposed Amendment <br />Department(s) involved: <br />Public Works Operations — <br />Water Filtration Plant <br />Contact person: <br />Hanna Lintukorpi <br />Phone number: <br />425-257-8946 <br />Email: <br />hlintukorpi@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Project: WFP Waste Landfill <br />Partner/Supplier: Aspect Consulting <br />Location: Everett Water Filtration Plant <br />Preceding action: Original Contract, dated 11.30.2020 <br />Fund: 401— Water & Sewer Utility Fund <br />Fiscal summary statement: <br />This amendment makes no changes to expenditures or budget. <br />Project summary statement: <br />Aspect consulting services will provide engineering and geotechnical support at the <br />Water Filter Plant's Inert Waste Landfill including updating regulatory documents, <br />evaluating the state of the lakeside berm, and assessing the stability of the backwash <br />solids in the landfill. <br />Amendment No. 1 extends the term of the existing Professional Services Agreement <br />between the City and Aspect Consulting to December 31, 2024. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement <br />with Aspect Consulting for engineering support with WFP Waste Landfill. <br />