My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/12/07 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/12/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 2:19:21 PM
Creation date
1/18/2023 2:18:55 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/7/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br />Project title: <br />Authorize the Mayor to sign Job Order Contracting (JOC) Amendment No 2 to Contract #2021- <br />022 for General Construction Services to Forma Construction Company & Burton Construction <br />Inc. <br />City Council Agenda Item Cover Sheet <br />Council Bill # 'rerun -ice use <br />Agenda dates requested: <br />December 7, 2022 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Amendments #2 <br />Department(s) involved: <br />Procurement <br />Contact person: <br />Theresa Bauccio-Teschlog <br />Phone number: <br />(425) 257-8901 <br />Email: <br />tbauccio@everettwa.gov <br />Initialed by: <br />Department head <br />Administration <br />Council President <br />Project: Job Order Task Orders <br />Partner/Supplier: <br />Forma Construction Company and Burton Construction <br />Location: Forma Construction Company and Burton Construction <br />Preceding action: <br />10/13/2021— Award Request for Proposal #2021-022 <br />11/24/2021— Authorize the Mayor to sign Job Order Contract <br />Amendment No 1 to Contract #2021-022 for General Construction <br />Services with Forma Construction <br />11/24/2021— Authorize the Mayor to sign Job Order Contract <br />Amendment No 1 to Contract #2021-022 for General Construction <br />Services with Burton Construction Inc. <br />Fund: Various <br />Fiscal summary statement: <br />Per Article 17 of the original contract, adjustment factors may be updated on each anniversary of <br />the contract date to account for changes in construction costs. The adjustment factor is applied <br />to costs in a fixed -price Construction Task Catalog to provide project costs for public works <br />projects below $500,000. The fixed price Construction Task catalog remains fixed for the length <br />of the contract. The adjustment factor covers the contractor's overhead, profit, and changes to <br />construction costs. For the upcoming year, the following updates are requested: <br />Description <br />Burton <br />2022 <br />Burton <br />2023 <br />Difference <br />Forma <br />2022 <br />Forma <br />2023 <br />Difference <br />Non -Pre- <br />Priced <br />1.1800 <br />1.18 <br />0 <br />1.1500 <br />1.1500 <br />0 <br />Normal <br />Working <br />Hours <br />1.3000 <br />1.4038 <br />+.1038 <br />1.3200 <br />1.4254 <br />+.1054 <br />Other Than <br />Normal <br />Working <br />Hours <br />1.3200 <br />1.4254 <br />+.1054 <br />1.3200 <br />1.4254 <br />+.1054 <br />Project summary statement: <br />RCW 39.10.420 authorizes the City to establish Job Order Contracting (JOC) to reduce the total <br />lead time and cost for the construction of public works projects for repair and renovation at <br />public facilities. JOC uses a competitive process to select general contractors to oversee the <br />completion of smaller projects at established unit pricing. JOC is one of many construction <br />delivery methods available to internal departments. Job Order Contracting allows departments <br />to save on engineering design costs because they do not have to develop a complete set of plans <br />and specifications or provide project management during the construction phase. The JOC <br />contractors also provide value -engineering services in which the contractor can provide alternate <br />construction methods, which can save money upfront. The ability for the project manager to <br />speak directly with the contractor during project development allows the contractor to suggest <br />better means and methods than may have been previously considered. The collaborative <br />approach is unavailable in a small works roster or design -bid -build process. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Job Order Contract Amendment No 2 to RFP #2021-022 for General <br />Construction Services to Forma Construction and Burton Construction Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.