My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/01/18 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/01/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 12:56:06 PM
Creation date
1/19/2023 8:54:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E EVERETT <br />Project title: <br />Amendment No.1 to Professional Service Agreement with 2812 Architecture to Provide <br />Architectural Services for the Everett Police Facilities Upgrades <br />City Council Agenda Item Cover Sheet <br />Council Bill # <br />Agenda dates requested: <br />Briefing <br />Proposed action <br />Consent <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />1/18/2023 <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Professional Services <br />Agreement <br />Department(s) involved: <br />Parks and Facilities <br />Police <br />Administration <br />Contact person: <br />Bob Leonard <br />Phone number: <br />425-257-8335 <br />Email: <br />BLeonard@everettwa.gov <br />Initialed by: <br />2ML <br />Department head <br />Administration <br />Council President <br />Project: Everett Police — Police Facilities Upgrades <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />2812 Architecture <br />Multiple Police Facility Locations <br />Professional Services Agreement 6/30/21 <br />Fund: Fund 342, Program 032 (CIP 1) <br />Fiscal summary statement: <br />Amendment No. 1 will amend the total compensation of the Professional Service <br />Agreement (PSA) with 2812 Architecture. <br />The source of funds for the added design is CIP-1. The original amount of the PSA was <br />$27,400. The amount of Amendment No.1 to the PSA is increased by $42,300 to include <br />additional design and engineering cost for Police Headquarters and Police Firing Range. <br />The total revised amount to the PSA is $69,700. <br />Project summary statement <br />Amendment No. 1 to the Professional Services Agreement with 2812 Architecture <br />modifies the scope of service to include multiple police facility locations, extend the <br />time of completion, the total compensation, and scope of services. <br />The scope of services will provide the original South Precinct Locker Room <br />improvements. The amended scope of services includes additional architectural and <br />engineering design for upgrades to office/conference spaces and exterior awning <br />replacement at Police Headquarters. It also includes roof replacement at the Police <br />Firing Range. <br />The anticipated completion of the design and construction bid documents is March 31, <br />2023. Staff will return to council for authorization to call for bids. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Amendment No.1 to professional service agreement with <br />2812 Architecture to provide architectural services for the Everett police facilities <br />upgrades. <br />
The URL can be used to link to this page
Your browser does not support the video tag.