Laserfiche WebLink
CONTRACTOR INFORMATION <br /> NATIONWIDE SOLAR <br /> ■■ '. MSOLAR CODE COMPLIANCE NOTES ■ ■;; SOLAR BONDING CONNECTION GROUND PATHS ■ 56P19 UYAL UPU9 372,WAE <br /> ®■■ ' MOUNT INSTALLATION GUIDE t PAGE ■■ t MOUNT INSTALLATION GUIDE I PAGE PHONE:253-7224-782 <br /> ®■ t t t I CSLB#aaameae9l3dc <br /> t <br /> --------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> Email:cbittongl1@comcast.net <br /> SYSTEM LEVEL FIRE CLASSIFICATION B <br /> The system fire cLass ratio requires installation in the mannerspecified in the SOLARMOUNT Installation Guide.SOLARMOUNT has been cLassified to the m Level to a v' <br /> fire porton of UL 1703.This UL 1703 classification has been incorporated into our UL2703 product certification.SOLARMOUNT has achieved system level performance ation 1Y Ide.� <br /> forsteepsLopedroofs.SystemLevelfireperformance isinherent inthe SOLARMOUNITdesign,and noadditional.mitigation measuresarerequired.Thefire cLassification �g�� �` SOLAR <br /> rating is onlyvalid on roof pitches greater than 2:12(slopes)2 inches per foot,or 9.5 degrees).The system is to be mounted over fire resistant roof covering rated for 0 <br /> the appLication.There is no required minimum or maximum height Limitation above the roof deck to maintain the system fire rating for SOLARMOUNT.Module Types <br /> &System Level.Fire Ratings are listed beLow: I <br /> O DINGT- ® f <br /> Rail Type Module Type System Level Fire Rating Rail Direction ModuLe Mitigation L— Tfo <br /> Orientation Required " Q a.rsM pe n..ln tioo,.<ma„,i«w,..an•,e s,.rsn.n,,,,.m.. <br /> Standard Rail Type 1,Type 2,Type 3&Type 10 Class A,CLass B&CLass C East-West J Landscape OR Portrait None Required r NATIONWIDE SOLAR <br /> North-South Landscape OR Portrait None Required 6407 NE 117TH AVE.SUITE B <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T BOLT <br /> Bonding Hardware creates bond between splice Ser rated flange nut removes L-fact anodhoidan VANCOUVER,WA 98662 <br /> Light Rail. Type 1&Type 2 Class A,Class B&Class C East-West Landscape OR Portrait None Required 0 Aluminum mid clampwith stainless steel bonding pins that pierce module frame bar and each rail section to bond L-Foot to stainless steelT-bolt PHONE:(800)908-8992 <br /> anodization m bond module to module through clamp Aluminums lice bar gap <br /> Serrated head penetrates rail anodlntlon getsolar@mynationwidesolar.com <br /> North-South Landscape OR Portrait None Required ,yam p spans acrossan a m pen Email: etsolar m nationwidesolar.com <br /> stainless steel nut bonds aluminum clamp m stain less steel T-boll eL*create be L m rail bona.Rall an at Least one side �to bond T-bou,nut,and L-foot m grounded <br /> of splice WRL be grounded. SM rail <br /> T[Tis racking system maybe used to ground and/or mount a PV module romplying with UL3703 only when the specific module has been evaluated for VERSION <br /> SerratedIr <br /> head penetrates rail anodizatlonmbontl T-bolt,nut,damp,and idaee:5p6x 4v and bateedmlmuilu�,are <br /> Lrti eLn e i r'r e-.rdJar moulrting incompliance with the included instroctions. moria es m sM rail an scer"L The span ber r,e eN 1_r°IL <br /> UL2703 CERTIFICATION MARKING LABEL �. mRAC'.. - augNmeneendtxmdmg. DESCRIPTION DATE REV <br /> Unirac SOLARMOUNT is Listed to UL 2703.Certification marking is embossed on aLL mid cLamps as shown. - INITIAL RELEASE 03/26/2022 UR <br /> Labels with additional information will be provided.After the racking system is fully assembled,a single <br /> Label should be applied to the SOLARMOUNT rail at the edge of the array.Before applying the label,the ( Tt <br /> E <br /> comers of the label that do not pertain to the system being installed must be removed so that only theInstalled system typeis showing. _._ T-ROtT� <br /> 4” N kgs <br /> Note:The sticker Label 26690g. <br /> should be placed such that it is visible,but not outward facing. L E p _-.-• _ _ B <br /> �' P S BONDING GING FAX <br /> MK:iOINVFBTFF LICE so <br /> Apdan I'. MOUNT <br /> oov,re Tlxeugn SF.E .TE <br /> Ermhau TSxnk Cable <br /> 1 <br /> IL BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND <br /> Hex not with captive Lack washer bonds metal WEEK washer dimples pleme anodired ralLm <br /> micmimerterflange mrtalnlesssteel T-bolt create bond between mil and lug <br /> r `-( 'y 80NPING MIUMI led Tbolth traces grounded <br /> on <br /> Sena d p ll ati Solid copper wine connected m Lug s muted m <br /> mb dT bolt,a[, dim tmg dzd <br /> a pee , SM h I _ d provide finalg—a ground cannect on <br /> e'-_— _ �J,s L ,•_ - ". +9 gil, a NOTE:IIsm lug andw be used when xmiedm <br /> `-` ,.„ mesdeafthe mFLSee page 1-3 for detefic <br /> aA1LTO L-FOOT 1 Ifar <br /> 5 STANDARD PAL w.. SMLIGHT RAIL +m�+�"'W"O"' <br /> PROJECT NAME <br /> ■MS MS SOLAR STANDARD SYSTEM GROUNDING ■ ■;; SOLAR ENDCLAMP, FIRST MODULE ■ va, o <br /> N t MOUNT INSTALLATION GUIDE t PAGE ■■ I MOUNT INSTALLATION GUIDE I PAGE <br /> ------------------------------------------------------------------------------------------------------------------------------------------- -----------------------------------------------O-------------------------4------------------------0-------------------------------- _ o o cn Nw <br /> WEEBLUG TERMINALTORQUE, li <br /> Single Use Only InAauconductor and Q W <br /> o torque m the laftei —. 04 <br /> 6.14 AWG:SR• 100-1 _ _ � �^ OC)M O O > <br /> At;- <br /> LLI <zMi� ti � L0 0 >_ LL <br /> , Z � O <br /> - � O D � <br /> Of WEEBLUG CONDUCTOR-UNIRAC P/N 0080025: INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into <br /> dit' — Apply Ami Seize and insert a bolt in the aluminum rail and through the clearance clamp is suppLLed as an assembLywith a 1/2' SLide end clamp on to rail.by SLide end clamp assembLy rail slot,Pressure may be applied to O <br /> e u" an' hole in the stainless steel flat washer.Place the stainless steel flat washer on the bolt, hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do Q M W :m U <br /> oriented so the dimples will contact the aluminum rail.Place the Lug portion on the Iails.The clamp should be instaLled on the with the top slot of the rails.Ensure engages with end of rail. not force clamp Into rail by pushing Z Lr) N 7 J 0 - - <br /> bolt and stainless steeLflat washer.Install stainless steel flat washe,Lock washer and rails prior to instaLLing end modules. bolt is extended as far as possible End cLamps are positioned on on bolt with excessive force. L_ N LZ <br /> L <br /> nut Tighten the nut until.the dimples are completely embedded into the rail and Lug. so that clamp is positioned at max. rails prior to the first end W 0— <br /> T <br /> TORQUE VALUE 10 ft lbs.(See Note on PG.A) distance from end of raLL 2 <br /> module and prior to the Last <br /> See product data sheet for more details,Model No.WEEB-LUG-6.7 end module. w <br /> GROUNDING LUG MOUNTING DETAILS: star Washer Is <br /> Details are provided for both the WEEB and ILsco products.The WEEBLug has a ngleUse only <br /> grounding symbol.located on the lug assembly.The ILsco Lug has a green colored <br /> set screw for grounding indication purposes.Installation must be in accordance �i m <br /> with NFPA NEC 70,however the eLectrical.designer of record should refer to the o" <br /> Latest revision of NEC for actual grounding conductor cable size. O 1 <br /> 9 9 TERMINALTr1RQUE, SHEET NAME <br /> Required if not using approved integrated grounding microinveters Install.coralu me and <br /> torque to the SoLumEng: <br /> :33in-s <br /> BAWD:2SPEC SHEETS <br /> B AWG:25 in-lhs <br /> 10-14AWG:201,tbs <br /> 1/2' <br /> GROUND LUG BOLT SIZE DRILLSIZE ILSCO LAY-IN LUG CONDUCTOR-UNIRAC P/N 008009P:Alternate Grounding Lug INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with <br /> WEEBLug 1/4- N/A-place in Top SM Fat slot -Driii,deburrholeand boltthruboth rail.wails per table. Install the first end moduLe flange in full contact with rail,rotate end clamp bolt until For best appearance, SHEET SIZE <br /> ILSCO Lug #10-32 7/32" TORQUE VALUE 5 ft lbs.(See Note on PG.A) onto rails with the flange of clamp engages with Ran a to provide cLam force. position module flushRai <br /> 9 P P with l ends of rails Rails ANSI B <br /> See ILSCO product data sheet for more details,Model No.GBL-4DBS the module frame positioned To ensure bolt is not over-torqued,use low torque setting � should not extend more <br /> Torque value depends on conductor size. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as than 1/Y beyond module. <br /> See product data sheet for torque value. of rails. Impact action of driver begins. Module must be fully <br /> NOTE:ISOLATE COPPER FROM ALUMINUM CONTACTTO PREVENT CORROSION supported by mils and 1 1 rr X 17" <br /> TORQUE VALUE 5l.=.e table and notes on PG.( A) ' cannot overhang ends <br /> End clamp bolt to 3 ft-lbs,No anti-seize of rails. <br /> SHEET NUMBER <br /> PV-16 <br />