Laserfiche WebLink
RESIDENTIAL PHO T O 0 LTAIC PERM IT APPLICATIO N (Page 2 of 2) <br /> OL CITY O FEVERETT PERM IT SERVICES <br /> 3200 CEDAR STREET, EVERETT, WA 98201 <br /> (P)425-257-8810 1 FAX 425-257-8857 1 (E)everetteps@everettwa.gov I www.everettwa.gov/perm is <br /> ELECTRaALPERMT CHICKRST <br /> DETERM WE IF YO LR PRO.ECT Q LALIFIES FO RAN O NER-THE-CO LNTER ELECTRICAL PERM IT: <br /> If you answer yes to all of the below questions, the project qualifies for an over-the-counter electrical perm L YE§ N O <br /> 1. PV modules, inverters, and com liner boxes are identified for use in PV system S. <br /> 2. The inverters are listed and laveled in accordance with UL 1741 and are listed for utility interaction. [IRC M 2302.4] <br /> 3. The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] <br /> 4. The system meets all current NEC, City, and Washington Cities Electrical Code requirements. <br /> 5. For Split-Buss modules the AC interconnection m ust be one of the six service disconnects. <br /> 6. M adm um load added to the panel board is vased on the rating of the panelboards bus/m ain O CPD com bination in accordance <br /> with NEC 705.12(D)(2)(3)(b), and is lim ted to (check the com tination below that applies): <br /> e225am p bus/200am p m an O CPD-13,400AC watts, m ax. 70am p inverter O CPD. <br /> ❑ 225am p bus/225am p m ain O CPD-8,640AC watts, m ax. 45am p inverter O CPD. <br /> ❑ 200am p bus/200am p m ain O CPD-7,860AC watts, m ax. 40am p inverter O CPD. <br /> ❑ 150am p bus/150am p m ain O CPD-5,760AC watts, m arc. 30am p inverter O CPD. <br /> ❑ 125am p bus/125am p m ain O CPD-4,800AC watts, m ax. 25am p inverter O CPD. <br /> ❑ 125am p bus/100am p m ain O CPD-9,600AC watts, m arc. 50am p inverter O CPD. <br /> ❑ 100a p bus/100am p m ain O CPD-3,840AC watts, m ax. 20am p inverter O CPD. <br /> ❑ O tier Electrical Perm it with Plan Review Required: <br /> Note 1: Listea un-aiterea Tactory m an/Dus com aination. Aneration OT the paneiDoara m an u Lvu win require pian <br /> ravia%A/ <br /> Note 2: The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the <br /> m axim um currents as calculated in 690.8(A). The rating or setting of overcurrent devices shall be permitted in <br /> accordance with 240.4(B)and (C). [NEC 690.8(B)(1)] <br /> Note 3: If a panelboard em ploys a snap switch rated 30 am peres or less in any branch circuit, it cannot be rated m ore <br /> than 200 am peres unless there is a supply side overcurrent protection at 200 am peres or less within the panelboard. <br /> This requirem ent does not apply to panelboards equipped with circuit breakers. Section 408.36(a)of the NEC. <br /> 7. 1 have attached the following Electrical O re-Line Diagram: <br /> ❑ Standard Electrical Diagram -6 Strings or Less <br /> Standard Electrical Diagram -4 Strings or Less <br /> ❑ Standard Electrical Diagram - M cro Inverter <br /> ❑ None of the above - Electrical Perm it with Plan Review Required <br /> PLEASE FILL O UTA CITY O FEVERETT ELECTRICAL PERMIT APPLICATIO NIF YO UQ LAL/FY FO RAN O 7C ELECTRICAL PERMIT. <br /> AG FEEM ENT: I hereby certify that I have read and exam hed this application and know the sam eto be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be com pleted whether specified herein or not. The granting of a perm t does not presum eto give <br /> authority to violate or cancel the provisions of any other state or local law regulating construction or the perform once of construction. That I am <br /> authorized by the owner of this property to perform the work for which application is m ode and I com ply with the State Contractors Law 18.27 <br /> RCW and 296.200 WAC. <br /> City of Everett O ficial Use O Hy <br /> ASSo aATED ELECTRICAL PERM T# <br /> 10/25/2022 E <br /> 0 w isr/Authorized Agent Signature D ate ( Revised 9/30/2016) <br />