My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6912 E CADY RD 2023-10-24
>
Address Records
>
E CADY RD
>
6912
>
6912 E CADY RD 2023-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 9:02:26 AM
Creation date
1/19/2023 2:17:55 PM
Metadata
Fields
Template:
Address Document
Street Name
E CADY RD
Street Number
6912
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake & Approval Sheet 0(FOR PERMIT STAFF ONLY) 40 PERMIT# g2Z//-O 7-5/ <br /> 1444 BUILDING PLANNING <br /> Intake OK by: Date: '� 2�"L Z Intake OK by: Assign To: Date: <br /> Intake Comments: 11111 Intake Comments: <br /> Zone � —I <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size, Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu" Fee:Type: Amount$ <br /> Basement allo ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction _ _Tee- Calculated: Credit: <br /> Occupancy Group Sf El Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Zf Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing El New System 12Not Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New System Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes E No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$?3S�660 Additional Notes: <br /> ajd711 \fr2 1/27 <br /> Approved By: Date: <br /> �r /� PUBLIC WORKS <br /> Additional Notes: 7 NCI 1� V4S M •6 t Intake OK by: Date: <br /> 4 © G D d ,/L S ��� Intake Comments: PW Worksheet Needed if: <br /> V.`,/T�t�-- ❑Sys Dev Eval(Util/Sw) ElTraffic Mit Eval <br /> Approved By: ' n Date: El Site Work/Drainage DAddress Letter <br /> pp Yf—[� �� ZZ'"L� <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: El Route this folder for PW Review at end ---PW Review Worksheet <br /> El Fire Sprinklers El Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑ This Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans- NO FIRE FEE ❑ A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Public Works has no scope--- PW Not Required <br /> ELECTRICAL/PLUMBING dditional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: ,i l tL/z.z. <br /> 2/Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.