Laserfiche WebLink
Installation <br /> Tools Required: tape measure, chalk line, stud finder, roofing bar, caulking gun, driver with 1/4" bit and 7/16" <br /> hex socket. <br /> ' 30 course <br /> R fter I I I <br /> I I <br /> I I <br /> I I <br /> i I I 2nd course' <br /> I I <br /> I I <br /> I I � <br /> i <br /> 1st course <br /> Locate rafters and snap vertical and horizontal lines Slide flashing, between 1 st and 2nd course, so the <br /> to mark flashing locations. Drill 1/4" pilot holes, then top is at least 3/4" above the edge of the 3rd course <br /> fill with roofing manufacturer's approved sealant. and the bottom is above the edge of the 1 st course. <br /> Line up pilot hole with flashing hole and insert lag Place Cap onto flashing in desired orientation for <br /> bolt with bonded washer through flashing. Tighten E/W or N/S rails and rotate 180 degrees. FlashFoot <br /> lag bolt until fully seated. 2 is now installed and ready for IronRidge XR Rails. <br /> Structural Certification <br /> Designed and Certified for Compliance with the International <br /> Building Code&ASCE/SEI-7. <br /> Water Seal Ratings <br /> Water Sealing Tested to UL 441 Section 27"Rain Test"and <br /> TAS 100-95"Wind Driven Rain Test"by Intertek. Ratings <br /> applicable for composition shingle roofs having slopes between <br /> 2:12 and 12:12.Tested and evaluated without sealant.Any <br /> roofing manufacturer approved sealant is allowed. <br /> UL 2703 <br /> Conforms to UL 2703 Mechanical and Bonding Requirements. <br /> See IronRidge Flush Mount Installation Manual for full ratings. <br /> Attach rails to either side of the open slot using <br /> bonding hardware. Level rail at desired height, then <br /> torque to 250 in-lbs (21 ft-lbs). <br /> ©2016 IronRidge,Inc.All rights reserved.Visit www.ironridge.com or call 1-800-227-9523 for more information. FM-FF2-MAN REV 1.20 <br />