My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
320 S CABOT RD 2023-01-26
>
Address Records
>
S CABOT RD
>
320
>
320 S CABOT RD 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 11:07:17 AM
Creation date
1/23/2023 1:31:08 PM
Metadata
Fields
Template:
Address Document
Street Name
S CABOT RD
Street Number
320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> OMEGA2707 Wetmore Avenue <br /> ne Evrett, WA 98201 <br /> ENGINEERING, INC. t 425.387.3820 <br /> f 425.259.1958 <br /> October 2, 2019 <br /> City of Everett <br /> Thad Newport <br /> Engineering/Permit Services <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: Plan Review Comments for 320 S Cabot Rd— (PW1908-051) <br /> Dear Thad, <br /> This letter is intended to summarize the changes made to the engineering package submitted <br /> for the initial permit review for this project. This letter addresses comments from you and Erik <br /> Emerson received in a comment letter dated October 1, 2019. This response letter has been <br /> laid out to match the format of the comment letter for your convenience. <br /> 1. Noted. <br /> 2. Noted. <br /> 3. <br /> a. An Operations and Maintenance manual has been created and is included in a <br /> separate document as part of this ',submittal package. The required language has <br /> been added to the drainage report. <br /> b. Noted. <br /> c. A new infiltration trench configuration has been designed to minimize the width of the <br /> trenches to the maximum extent feasible with the space available on the property. All <br /> trenches are six feet wide and parallel trenches are set at least six feet apart. <br /> d. The correct flow chart has been added to the revised drainage report. <br /> e. The City's standard permeable pw"ernent detail has been removed from the plans <br /> and a `permeable paver section/detail' has been added. <br /> f. The Transition Zone Detail has been revised to reference the correct sheet. <br /> Thank you for taking the time to review the revised plans and report for this project. Please feel <br /> free to contact me with any questions you may have. <br /> Sincerely, <br /> eez.//), <br /> Elias J. Tro man, E.I.T <br /> RECEIVED <br /> OCT 0 3 2019 <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.