My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:39:15 AM
Creation date
1/24/2023 8:09:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PU BLICIVORKS PERMIT *Date Applied: 10/21/2020 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2010-036 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B2010-042 <br /> EV E R E T T Everett, WA 98201 Planning Reference#: SEPA18-005 <br /> WASHINGTON 425-257-8810 Public Works Fee: $143,496.09 <br /> ...Continued from other side <br /> 13.See Hearing Examiner decision for SMA 18-006,SPU 18-004 and REVI 18-029,dated January 25,2019 for additional construction and site <br /> conditions. <br /> 13.Vehicles that use backup alarms must use broadband backup alarms. <br /> 14. Noise from temporary construction sites is not allowed 10:00PM—7:00AM weekdays,6:00PM—8:00AM weekends unless a variance has <br /> been issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to <br /> commencing work. Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> Public Works Permit Fee Breakdown: <br /> Grade/Fill/Excavate(44,000CY) $685.00 <br /> Paving(299,508SF) $1,497.54 <br /> PW Plan Review $10,267.22 <br /> PW Site Inspection $20,534.43 <br /> Stormwater System Development Fee $110,311.90 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> 08 Z Za Zt agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.