Laserfiche WebLink
4 Di 1 I <br /> PRIVATE WORK <br /> f Item Unit Quantity Unit Price Amount <br /> Storm Sewers <br /> 8 Inch Pipe L.F. 1,081 25.50.00 54,050.00 <br /> 8 Inch Pipe L.F. 324 30.00 9,720.00 <br /> 12 Inch Pipe L.F. 305 40.00 1 2,200.00 <br /> Yard-Basin 24 Inch Pipe {ter- L.F. 410 400400` 28,700.00 <br /> 70.00 <br /> StariddId CatLI►Basin Ea. 2 900 00- 16,000.00 <br /> 96 Inch MH 8,000.00 <br /> Extra Depth Excavation, —r ,`L.F. 1089 10b00 108,900.00 <br /> (Over 12'deep) 36 Inch Pipe <br /> 48 Inch MH/CB Type II Ea. 1 5 3,000.00 45,000.00 <br /> 60 Inch MH/CB Type II Ea. 12 4' 0 50,400.00 <br /> Extra Depth MH/CB, Ft. 130.00 <br /> (48 inch per ft. over 12') <br /> Extra Depth MH/CB, Ft. 150.00 <br /> (54 inch per ft. over 12') <br /> Restrictor/Pollution Control, Ea. 1,500.00 <br /> (12 Inch Large) <br /> Sto ue en at ri Vaon V u t ault Ea. 1 177,150.00 177,150.00 <br /> toI I iWacielfMKAtgement Vault Ea. 1 65,000.00 65,000.00 <br /> Ogater Separator <br /> Ea. 1 25,000.00 25,000.00 <br /> Storm Sewers Total: $ 592,120.00 <br /> (---- / ) <br /> COST EST FEE CALC-2019 <br />