My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:39:15 AM
Creation date
1/24/2023 8:09:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST-EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS <br /> SANITARY SEWER PUMP CALCULATIONS <br /> 11 l <br /> From: Arnie Roshak <ARoshak@everettwa.gov> <br /> Thu a Feb 12019 Sent rsd ruary 2 , 3:57 PM <br /> To: Ray Johnsony, <br /> Cc: Sabrina Fandler, David Fillmore;Kathy Hargrave <br /> ISubject: RE:Connection to the existing 48 inch South End Interceptor <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> 1 <br /> HI Ray, <br /> The South End Interceptor is pressurized at this location. Operating pressure is in the range of 15-22 psi. I also got some <br /> feedback from Maintenance and they asked that both a check and isolation valve(gate or plug)be provided at the 6"FM <br /> connection to the SEI. <br /> IThanks, <br /> I <br /> CELE3RATING oshak� .E <br /> l 2 5 Associate <br /> ArnieR EngineeP .r I Public Works-Utilities Engineering <br /> A 425.257.7249 13200 Cedar St.,Everett,WA 98201 <br /> A story wort,telling everettwa.&ovJoublicworks I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public-ecords and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> IFrom:Ray Johnson<rayj@sittshill.com> <br /> Sent:Thursday,February 21,2019 3:40 PM <br /> To:Arnie Roshak<ARoshak@everettwa.gov> <br /> Cc:Sabrina Fandler<SFandler@everettwa.gov>;David Fillmore<davidf@sittshill.com>;Kathy Hargrave <br /> <kathyh@sittshill.com> <br /> Subject:Connection to the existing 48 inch South End Interceptor <br /> Based upon the asbuilt civil drawings for the South End Interceptor,we assume that this pipe is pressurized based upon <br /> the manhole's flanged riser. Please verify. We were directed to connect our forcemain crossing the 80 utility easement <br /> to the capped DI spool located on top of interceptor. If this interceptor is pressurized,we need to understand what that <br /> is in order to design the 6"DI connection and the Penske onsite temporary sanitary sewer forcemain system. <br /> Ray Johnson,A.S.L.A. ■ ,,,_ r <br /> I SITTS & HILL ENGINEERS, INC. <br /> CIVIL ■ STRUCTURAL • sutvEvzr <br /> htto:llvnaw.Silts-h III-engineers.corn/ <br /> I <br /> I <br /> SITTS & HILL ENGINEERS, INC. 5 <br /> TACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.