Laserfiche WebLink
INTERWEST—EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts& Hill Engineers, Inc. <br /> OPERATION AND MAINTENANCE MANUAL Job Number 18,831 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> The applicable maintenance checklists from the 2019 Stormwater Management Manual for Western Washington <br /> (DOE Manual) and the City of Everett Design and Construction Standards and Specifications for Development have <br /> been included with this manual for review during routine maintenance inspections. <br /> Section 4— Maintenance Frequency <br /> Following construction of the project, all facilities shall be inspected and maintained according to their respective <br /> maintenance checklists included at the end of this manual. One form should be filled out for each facility on-site. <br /> I <br /> It is recommended that the maintenance checklists be kept in a log book or binder on-site for documentation and <br /> review purposes. <br /> When deficiencies are noted,the problems are to be corrected as soon as possible. Any spill of hazardous material <br /> I (e.g. fuel, lubricant, herbicide, etc.) will be cleaned up immediately. Contaminated material will be disposed of <br /> properly. Per the DOE Manual, "If the spill has reached or may reach a sanitary or a storm sewer, ground water, or <br /> surface water notify the local jurisdiction, Ecology, and the local sewer authority immediately. Notification must <br /> comply with all federal spill reporting requirements." <br /> Any questions about the existence of a problem should be directed to a professional engineer. <br /> See the following pages for plan sheets showing facilities to be maintained. <br /> SITTS& HILL ENGINEERS, INC. 2 <br /> TACOMA, WASHINGTON <br />