My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:39:15 AM
Creation date
1/24/2023 8:09:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> INTER WEST—EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts & Hill Engineers, Inc. <br /> I <br /> OPERATION AND MAINTENANCE MANUAL Job Number 18,831 <br /> I <br /> - ' _ - Maintenance Decision Tree <br /> � °' The need for maintenance is type.,I:bases on results of the <br /> • <br /> :4011 <br /> inspection. The following Maintera•ice Decision Tree should be used as <br /> i... -ter:1S,+ a general guide.(Other factors,sLcl'as Regulatory Requirements,may <br /> I <br /> * , need to be cons cored) <br /> +. '� �• 1. Sediment loading on the vau t Poor. <br /> K ,� 0 rw* �' ;"C~ 4`: a. I= :--4"of accumulated sediment,maintenance is <br /> _ • I, 2. Sediment loading on top of trio cartridge. <br /> .. �--.- _ i1 a. If>1!4"of accumulation,maintenance is required. <br /> �r..` - 3. Submerged cartridges <br /> ..t <br /> a. If:>4-of static water above cart,dge bottom for more <br /> t' than 24 hours after end of rain event,maintenance <br /> a <br /> Inspection Procedures. • is required.(Catch basins have standing water in the <br /> I <br /> ' `•' -N" ' . ,' -- cartridge bay.) <br /> 4. Plugged media <br /> The primary goal of an inspection is to assess the condition of a. If pore soace between media granules is aosent, <br /> I <br /> cartridges relative to the level of visual sediment loading as maintenance is required. <br /> it relates to decreased treatment capacity.It may be desirable to <br /> conduct this inscection during a storm to observe the relative 5. Bypass condition <br /> flow through the filter cartridges.If the submerged cartridges a. If inspection is conducted dunng an average rain fail <br /> I are severely plugged,then typically large amounts of sediments event and StorrnFilter remains in bypass condition <br /> will be present and very little flow will be discharged from the (water over the internal outlet baffle wall or submerged <br /> drainage pipes. If this is the case,then maintenance is warranted cartridges),maintenance s required. <br /> and the cartridges need to be replaced. <br /> 6. Hazardous mater al release <br /> I <br /> Warning In the case of a spill,the worker should abort a. If hazardous material release(automotive fluids or other) <br /> inspection activities until the proper guidance is obtained, is reported,maintenance s required. <br /> Notify the local hazard control agency and Contech Engineered <br /> Solutions immediately. 7. Pronounced scum line. <br /> To conduct an inspection: a. If pronounced scum line(say= '/4"thick)is present <br /> above top cap,maintenance is required. <br /> Important:Inspection should be performed by a person <br /> who is familiar with the operation and configuration of the <br /> I StormFilter treatment unit. <br /> I. If applicable,set up safety equipment to protect and notify <br /> surrounding vehicle and pedestrian traffic. __ <br /> I <br /> 2. Visually inspect the external condition of the unit and take . <br /> notes concerning defects/problems. a <br /> tothesystem ' <br /> 3. Open the access portals vault and allow the vent. , <br /> I 4. Without entering the vault,visually inspect the inside of the - , <br /> unit,and note accumulations of liquids and solids. <br /> 5. Be sure to record the level of sediment build-up on the floor - <br /> of the vault,in the forebay,and on top of the cartridges.If i <br /> ' flow is occurring,note the flow of water per drainage pipe. <br /> Record all observations.Digital pictures are valuable for <br /> historical documentation. <br /> 6. Close and fasten the access portals. 'sue :' <br /> Aikpi <br /> I 7. Remove safety equipment. <br /> 8. If appropriate,make notes about the local drainage area i. <br /> relative to ongo-rig construction,erosion problems,or high <br /> loading of other materials to the system. <br /> I 9. Discuss conditions that suggest maintenance and make <br /> decision as to weather or not maintenance is needed_ <br /> 3 <br /> I <br /> SITTS& HILL ENGINEERS, INC. 21 <br /> ITACOMA, WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.