Laserfiche WebLink
I <br /> INTER WEST—EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts& Hill Engineers, Inc. <br /> I CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 18,831 <br /> Section 2 — Existing Site Conditions <br /> The site is located north of the northerly limit of Railway Avenue in the City of Everett. Please see Figure 1 (Vicinity <br /> Map). <br /> e se recently femo P00 , which also included the installation of temporary <br /> erosion and sedimentbe control BMPsilledunder such asr construction it entrances, silt fence, and a temporary sediment pond. Ad Constructionite Stormwater Pollution Prevention Plan (CSWPPP7- ) was prepared for the fill project and was approve <br /> ' The by the Cityhas. <br /> Existing site surfacesn are entirely made of <br /> p the imported fill material. See Table 1 fora summary of surface coverage <br /> prior to the placement of fill. The project site doesn not receive 46 run-on from neighboring properties. The steepest <br /> slopes on site are 3H:1V fill slopes. Runoff in the existing condition is directed to the temporary sediment pond, <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> which discharges to a ditch along the adjacent BNSF railway.See Sheet C1.0 of the project drawings for existing site <br /> topography. <br /> SITTS& HILL ENGINEERS, INC. 3 <br /> TACOMA, WASHINGTON <br />