Laserfiche WebLink
I <br /> INTERWEST—EVEREIT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts& Hill Engineers, Inc. <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 18,831 <br /> Section 4—Critical Areas <br /> The determination of critical areas on and near the project site was accomplished using the City of Everett Critical <br /> Areas Maps 1 through 4. These maps indicate that the project site is located within a liquefaction hazard area and <br /> the site contains a very high/severe erosion hazard area and a medium slope landslide hazard area. However, <br /> Critical Areas Map 3 indicates that very high/severe erosion hazard areas are associated with slopes steeper than <br /> 40%.Also,this map is dated 2006.Therefore,it is likely that the erosion hazard and landslides hazard areas indicated <br /> are due to the previous land use of the project site in 2006 for material stockpiling. According to City of Everett <br /> Critical Areas Map 6, the Snohomish River near the project area is home to regular large concentrations of <br /> waterfowl. Parts of the project site are located below the 100-year base flood elevation. However, since the site <br /> has been filled (as a part of previously-approved fill project), no part of the area proposed for construction is below <br /> the flood elevation of 15.40. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> SITTS& HILL ENGINEERS, INC. 5 <br /> I <br /> TACOMA, WASHINGTON <br />