Laserfiche WebLink
INSPECTION REPORT <br /> Date ����� Permit: <br /> Contractor: �� Kc,,r <br /> "lam rr\\ � <br /> Owner: _ M I— <br /> Site Address: ` ( M l <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In r I Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service, Framing ❑Rooftop Units ❑Water Service <br /> ❑Grou�r((ding Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drai ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ E] F]OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257�-88881 FOR REINSPECTION—24 hour notice required <br /> N <br /> Sv <br /> Al <br /> LA <br /> Inspector: , Date: <br /> E I R(10/06) DATABAR,INC. <br />