Laserfiche WebLink
DOWN TO 40OA-' <br />OUTDOOR RECEPT <br />CONTROL <br />CABINET <br />C6 <br />i <br />i <br />/4"C 4#10, 1#10G TYPICAL OF 2 1TO START/STOP STATIONS LOCATED ON <br />ST FLOOR AT COL BE/2 (SEE DWG 40-051-1 E112) AND j <br />ST FLOOR AT COL C/3.25 (SEE DWG; 40-051-1 El 17) <br />I I <br />i <br />I <br />I 1 <br />TO SUB 2-I./Al 3V51-4VD2-D/4abc <br />3-1 /2"C, 3 500', #2G F 3/4"C - 3# 10, 1 # 10G <br />P-20 30A <br />1 /2"C - 3#22 Rs <br />3V51®4VD2-D <br />1 /2"C. 3--# 10 & RL <br />1®#12GRD. <br />CK :1 abc. 3E116 E554 8 <br />-2 TON HOIST 2'C 3#250, #2G <br />" ' 10HP 30A <br />-��UH-7 <br />SYM REVISION <br />c"I AS -BUILT <br />0) J FACTORY SUBSTATION REPLACEMENT <br />® K PIW UPGRADES - ADDENDUM A <br />N L PIW UPGRADES ADDENDUM A - DCN-01 <br />o <br />o- <br />1 <br />I <br />3E116 E554-1 <br />VFD-EF1 KVA <br />MCC--6/C2 <br />2"C, 3#250,#2G --- <br />MCC-6 B2 <br />2"C 3250, #2G <br />2"C 3#250, #2G <br />EF--1 <br />150HP <br />-- - -_- - MCC-6/D5 <br />3/4"C, 3#12,3#14 <br />1 /2"C, 2 '!14 <br />'' ® . <br />i I <br />i <br />I <br />r <br />' I <br />i <br />K) <br />�2��12, BLK & RED <br />1 12, WHITE !POWER SHUTDOWN CONTROL <br />4V51 -� 4TC2.5 <br />POWER SHUTDOWN { P (ON CATWALK) <br />TO SUB 2-1 /A4 INTERFACE RELAY <br />3"C, 3#500, #2G <br />MCC-6/D6 3E116 E607-09,13,17,21 1 <br />1 3/ "C, 3#12,2#14 VFDS FOR P7, P�, P9 & P10 3E116 E554-6 <br />3'El 161 E554-2 I 3E116 E554-3 <br />1ST FLOOR COL C/1 25 & C/2 <br />j <br />--6 30A <br />AHU <br />VFD-EF2 10HP <br />' P7 <br />1 <br />AHU-5 <br />3HP j <br />! 3V51-3V <br />VFD-PF-400 1 /2"C, 3# 12 <br />I <br />EF-7 <br />I' 25HP <br />E116 LE603-11 <br />i MCC-5/A2 <br />Ej 3/4"C, 3#4 <br />F =2 <br />150HP <br />MCC-6/D2,D3 <br />1 "C, 6#6, #BG <br />4 <br />3/4"C, 3#4 <br />MCC-6/D4 <br />UH-6 <br />U <br />1/21C, 2#12 r3O <br />9 <br />!m i <br />225 T _ram <br />1 „C, #6 VFD CABLE�9 VFD-EF6 VFD-EF3 KVA <br />I 1 C TO P9 �6 ! MCC-5 C_2 <br />2"C 3# 50, #2G <br />7 MCC--`J2'5 <br />2 <br />PULL BOX 2"C 30, 2G <br /># <br />i2"C 3 250, 2G (! <br />4 ! I # # Ili <br />TO 1ST FLOOR <br />3 497 2"C 3 250, #2G <br />/ <br />I ill <br />! AC-2 EF-3 <br />BHP EF- 6 125HP J 150HP <br />7 P <br />fl <br />3V51 -3VD2-D/1 2al <br />X351-3VD2/11 abc <br />11 \ `, 3/4"C, 3# 10, 10G I 99 1- <_ <br />1 _- <br />- r v2 1 2 C, 3 <br />MCC-5 C,C MC <br />MCC-4 <br />9� 2 CC-10 <br />,1 -1 /4 C, !I 6#4, #SG �! <br />7 ! 1 L QUBLE ENDED SUBSTATION il.! <br />- i S B 2-2 SUB 2-1 i <br />V51 -4) ( (V51-3) 1 <br />..I <br />(� I <br />1 1 „ <br />- 3E116 E565-1-PH1/2 3E116 E565-1A/'IB/C <br />1/2"C, 2#14 <br />i <br />X3V51-3VD2/7a�c - / <br />i <br />X3V51-3VD2-D - <br />EMERG. POWER - <br />TRANSFER SWITCH <br />W/300A BREAKER <br />THIRD FLOOR PLAN <br />SCALE. 1/599-19-0" I �! <br />BY <br />APPROVED <br />DATE SYM <br />REVISION <br />J#964058 <br />CANADA <br />07.07.96 D <br />INF-REPLACE VENTILATION FAN <br />W2583306- <br />CASNE <br />CEC <br />12.1 & 14 E <br />INF-REPLACE VENTILATION FAN -- REVISED <br />20808468 <br />CASNE <br />EEK <br />01.25.21 F <br />WATER PRESSURE PUMP VFD INSTALLATION <br />20808468 <br />CASNE <br />EEK <br />04.30.21 G <br />IDC STALL CAPACITY 40-51 <br />H <br />ADD VFD FOR AHU-5 <br />BY <br />APPROVED <br />DATE <br />11487110 <br />KR/TT <br />DM/FB <br />08.01.11 <br />11487110 <br />KR/TT <br />DM/FB <br />08.10.11 <br />10963626 <br />BDH <br />TT/FB <br />10.06.11 <br />10607711 <br />AKC <br />TT/FB <br />1/31/12 <br />10561890 <br />T.T. <br />DM/BAO <br />03/08/12 <br />LEGEND GENERAL NOTES <br />SEE SHEET EOa FOR GENERAL LEGEND. 1. ELEVATION 137'-0" AND ABOVE IS RATED AS <br />NON --HAZARDOUS UNLESS NOTED OTHERWISE. <br />-- 2. CONDUIT: ABOVE 137'-0" SHALL BE 1 /2" EMT UNLESS <br />NOTED OTHERWISE. BELOW 137'--0" SHALL BE 1 /2" <br />GRS UNLESS NOTED OTHERWISE. <br />I <br />I <br />3. CONDUCTORS SHOWN: #12 AWG, STRANDED COPPER, <br />INSULATION TYPE THHN/THWN, UNLESS NOTED <br />OTHERWISE. <br />I <br />- , 4. COLOR CODE CONDUCTORS: IDENTIFY CONDUCTORS <br />BK <br />WHICH DO NOT HAVE APPROPRIATELY COLORED <br />INSULATION WITH COLOR TAPE WHEREVER CONDUCTORS <br />ARE ACCESSIBLE. IDENTIFY INSULATED GROUND <br />CONDUCTORS IN ACCORDANCE WITH THE LATEST NEC <br />(USING TAPE). COLOR CODE AS FOLLOWS: <br />i <br />I <br />j 208Y/120V 480Y 277V <br />I AO (LEFT BUS IN PNL) BLACK BROWN <br />BO (CENTER BUS IN PNL) RED ORANGE <br />CO (RIGHT BUS IN PNL) BLUE YELLOW <br />E NEUTRAL WHITE GRAY <br />EQUIPMENT GROUND GREEN GREEN <br />ISOLATED GROUND GRN/YEL* GRN/YEL* <br />*GREEN WITH YELLOW TRACER <br />------- --- -- - - --- __-- w �, BI 5. DYMO LABEL EACH RECEPTACLE, JUNCTION/OUTLET BOX <br />� WITH CIRCUIT IDENTIFICATION. <br />I <br />6. POST NEW OR REVISED PANEL SCHEDULES IN <br />ELECTRICAL PANEL UPON COMPLETION OF PROJECT. <br />1=D <br />_ 7. SEE E565 SERIES OF ENLARGED ELECTRICAL ROOM <br />PLANS AND THE E4 SERIES OF PHASED ONE -LINE <br />MODIFICATIONS FOR THE WORK ASSOCIATED WITH THE <br />CCU SUBSTATION REPLACEMENT PROJECT. <br />CD REFERENCE NOTES <br />1 K <br />/3E116 E554-4 <br />1 SEE AHU-5 VFD CONTROL DRAWING 40-051-606 <br />, <br />i <br />l <br />i <br />I <br />CONSTRUCTION NOTES <br />� <br />M <br />X2-1/2'C <br />FD EF4 CC-4�D2 <br />3#250, 11#2G Q 1 PROVIDE AND INSTALL VFD PANELS FOR PUMPS <br />2"C 3#250, #2GI P7, P6, P9 & P10. LOCATE BACK TO BACK <br />ADJACENT TO EXISTING PULL BOX. MAINTAIN 3" <br />j MIN BETWEEN VFD ENCLOSURES. PROVIDE STRUT <br />STAND. <br />I <br />P PROVIDE AND INSTALL (2) 60A, 6" BREAKER -ONLY <br />FF-4 I MCC BUCKETS IN MCC-5. CH TYPE AND AIC <br />150HP RATING OF EXISTING MCC. <br />PROVIDE AND INSTALL CONDUIT AND WIRE FROM <br />MCC-5 TO VFDS. <br />Ii it <br />li I 4 INTERCEPT AND RE-ROUTE 1 "C FOR P7 & P6 <br />II FROM MCC-6 TO VFD. PULL NEW CONDUCTORS. <br />INTERCEPT EXISTING SPARE 1-1/2" CONDUIT TO <br />I1 FIRST FLOOR AT BASE OF PULL BOX AND <br />I <br />I RE-ROUTE IT TO VFD, AS SHOWN, PULL <br />Y=1 �I, i CONDUCTORS TO P 10 PUMP DISCONNECT ON 1 ST <br />MCC-5/F1 i; lI FLOOR. <br />3/4 C, 3#12,3#i�4 i <br />l 1I; 6 PROVIDE AND INSTALL NEW 1" CONDUIT FROM VFD <br />I 30A = UCH-5 �` THROUGH EXISTING CHASE TO FIRST FLOOR. PULL <br />CONDUCTORS TO PUMP P9 DISCONNECT ON 1ST <br />ri -- �� <br />II 1OHP _ <br />1,1 /2 C,_2# 14 -- ---- ---- --- - lir---1--- ..- --� 1 FLOOR. <br />1 2 „C 3 � _12 -- PROVIDE AND INSTALL CONDUIT AND WIRE FROM <br />/ # PANELBOARD TO PULL BOX FOR TANK HEATER. <br />j ! UTILIZE SPARE 3/4"C FROM PULL BOX TO FIRST <br />3V51 -4VD2 -D 1 5 FLOOR. PULL CONDUCTORS HEATER CONTACTOR. <br />l <br />/111 APIP1 IA IP'­i"AI 1 i (lA I`l iif AI/f"'li IAI <br />TO SUB 2-1/A5 <br />3"C, 3#500, #2G <br />,,_e, 10"', <br />-16 EF-34\,41 <br />EF <br />y <br />1OHP <br />X3V51-3VD2/12abe' <br />®7 <br />i <br />MCC,-5/A4 <br />-7 <br />CONSTRUCTION NOTES <br />6: <br />SEE SHEET 1 E116 FOR CONTINUATION OF THE <br />10 WIRE SIZE FOR P9 & P10 VFDS TO <br />CONDUIT RUNS AND FOR LOCATIONS OF TANK AND <br />INCREASE #4. <br />a <br />KEY I PLAN N <br />PUMPS. <br />g• <br />PROVIDE EXPLOSION PROOF SEALOFFS AS <br />THIRD FLOOR <br />REQUIRED BY THE NEC, ARTICLE 501. <br />BUILDING 40-51 <br />8' 4' <br />0 4' <br />8' 16' <br />DCN-01 <br />CE CASNE Engineening <br />SCALE: <br />1 /599-1 9-09> <br />APRIL <br />3545 FACTORIA BOULEVARD SE., SUITE 200 <br />BELLEVUE, WA 98006 <br />, <br />(425) 522-1000 WWW. CASNE. COM JOB NO. 191-089 <br />-- <br />It <br />r <br />E. C, ACCEPTABILITY <br />WA�� 6� <br />DRAWN <br />L. BARTON <br />DATE <br />07.07.96 <br />SUBTITLE <br />a /77 L <br />CURRENT REVISION <br />20B0�46B <br />SYMBOL <br />L <br />DATE <br />®4.30.21 <br />CHECKED <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />A. COWARD <br />07.07.96 <br />SHEET <br />c" <br />® <br />® <br />APPROVED BY <br />DEPT. <br />DATE <br />ENGINEER <br />TITLE PIW GRADES - ADDENDUM Aoc <br />3E1 16 <br />35276 <br />CHECKED <br />JOB NO. <br />W2563306 <br />COMP NO. <br />40-051-3E116cc <br />APPROVEDBUILDING <br />7ST �� <br />L <br />APPROVED <br />ELECTRICAL MASTER COL. BK-�-D/1-3 EVERETT, <br />WA <br />D4�/G NO. <br />40-051-3E116 <br />