My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2021 BLDG 40-51 Plans 2023-01-25
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-51
>
Plans
>
3003 W CASINO RD 2021 BLDG 40-51 Plans 2023-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:41 PM
Creation date
1/24/2023 11:06:29 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-51
Permit
B2105-016
Year
2021
Notes
UPGRADE PIW SYSTEM IN BASEMENT OF 40-51 BLDG / INSTALL NEW
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INCLUDE® <br />IN SET <br />DRAWING NO, <br />SHEET NO. <br />DRAWING TITLE <br />REV <br />BUILDING <br />ARCHITECTURAL <br />I� <br />STRUCTURAL <br />CIVIL <br />MECHANICAL REMOVAL <br />0 <br />140-032-45016P9R <br />POIR <br />UNDERGROUND & TRENCHES <br />0 <br />140-032-4501-EXH P R <br />EXH-P9R <br />EXHIBIT DEMOLITION PHOTOS <br />0 <br />140-032-45 1-P11 R <br />P11 R <br />UNDERGROUND & TRENCHES <br />0 <br />140-032-4501-EXH P11 R <br />EXH-P11 R <br />EXHIBIT DEMOLITION PHOTOS <br />0 <br />140-032-4501-P13R <br />P13R <br />UNDERGROUND & TRENCHES <br />0 <br />140-032-4501-EXH�P13R <br />EXH®P13R <br />EXHIBIT DEMOLITION PHOTOS <br />PROCESS FLOW DIAGRAMS <br />PIPINGINSTRUMENTATION <br />61 <br />MECHANICAL <br />Lu <br />ELECTRICAL <br />LEAK DETECTION <br />0 <br />40-032-TNE216R <br />TNE216R <br />EMCS P - TUNNEL VIEW ® REMOVAL <br />---®- - <br />40-032-T E66 <br />TNE66 <br />PARTIAL TUNNEL 206Y/120V POWER PLAN <br />0 <br />40-032-TNE216 <br />�TNE216 <br />EMCS PLAN e TUNNEL VIEW <br />,. <br />0 <br />40-032-E539 <br />E539 <br />LEAD DETECTION SYSTEM AND DETAILS <br />0 <br />40-032-E701-1 <br />E701-1 <br />SUMP LEAK DETECTION PANEL CONTROL WIRING DIAGRAM <br />i <br />a <br />I <br />Lu <br />I <br />0 <br />i <br />sym <br />REVISION <br />DY <br />APPROVED <br />DATE SYM <br />REVISION <br />ORIG <br />PUMPED <br />INDUSTRIAL WASTE UPGRADES <br />J# 20806468 <br />KJ <br />JMF <br />01.25.21 <br />A <br />PIW UPGRADES ADDENDUM A - DCN-01 <br />20808468 <br />KJ <br />JMF <br />04.30.21 <br />INCLUDED <br />IN SET <br />DRAWING NO. <br />SHEET NO. <br />DRAWING TITLE <br />REV <br />BUILDING 40-033 <br />ARCHITECTURAL <br />STRUCTURAL <br />CIVIL <br />MECHANICAL REMOVAL <br />DIAGRAMSPROCESS FLOW <br />PIPING INSTRUMENTATION D <br />MECHANICAL <br />0 <br />40-033-TNM170 PIW <br />TN 170-13 <br />PUMPED INDUSTRIAL WASTE PLAN - TUNNEL <br />0 <br />40-003®T M170 PIW <br />TNM170-1 <br />PUMPED INDUSTRIAL WASTE P - TUNNEL <br />0 <br />4-033-TNM17 PIW <br />TN 170-16 <br />PUMPED INDUSTRIAL WASTE PLAN G TUNNEL <br />0 <br />40-033-TINM170 PIW <br />TNM170-17 <br />PUMPED INDUSTRIAL WASTE PLAN - TUNNEL <br />0 <br />40®03 GM5 6®1 <br />536=1 <br />PUMPED INDUSTRIAL WASTE - DETAILS <br />0 <br />40®033®M533G2 <br />536m2 <br />PIPE SUPPORT DETAILS <br />0 <br />40m033-536®3 <br />56m3 <br />PIPE SUPPORT DETAILS <br />ELECTRICAL <br />LEAK DETECTION <br />0 <br />40-033-TNE21 R <br />TNE213R <br />EMCS PLAN e TUNNEL VIE - REMOVAL <br />0 <br />40-033-TNE216R <br />TINE216R <br />EMCS PLAN = TUNNEL VIEW - REMOVAL <br />0 <br />40-033-TNE217R <br />T E217R <br />EMCS P - TUNNEL VIEW - REMOVAL <br />0 <br />40-033®1 E214R <br />1 E214R <br />PARTIAL FIRST FLOOR EMCS PLAN - REMOVAL <br />0 <br />40-033-TNE213 <br />TNE213 <br />EMCS PLAN - TUNNEL LEVEL <br />0 <br />4 -03-TNE216 <br />TNE216 <br />FMCS PLAN ® TUNNEL LEVEL <br />0 <br />40-033-TNE217 <br />TNE217 <br />EMCS PLAN m TUNNEL LEVEL <br />0 <br />40-033-1 E64 <br />1E64 <br />PARTIAL FIRST FLOOR 208Y/120V POWER PLAN <br />0 <br />40-033-1 E214 <br />1 E214 <br />PARTIAL FIRST FLOOR EMCS PLAN <br />0 <br />40- 33®E549 <br />E549 <br />LEAK DETECTION SYSTEM AND DETAILS <br />0 <br />40m033-E703-1 <br />E703®1 JSUMP <br />LEAK DETECTION PANEL CONTROL WIRING DIAGRAM <br />INCLUDED <br />IN SET <br />DRAWING NO. <br />SHEET NO. <br />DRAWING TITLE <br />REV <br />BUILDING _ <br />ARCHITECTURAL <br />STRUCTURAL <br />CIVIL <br />MECHANICALL <br />DIAGRAMSPROCESS FLOW <br />PIPING INSTRUMENTATION <br />MECHANICAL <br />ELECTRICAL <br />LEAK DETECTION <br />0 <br />0-0 4-TNE21OR <br />TNE21OR <br />PARTIAL FIRST FLOOR EMCS PLAN m REMOVAL <br />0 <br />40-034-1 E214R <br />1 E214R <br />PARTIAL FIRST FLOOR EMCS PLAN a REMOVAL <br />0 <br />4®34®TNE210 <br />TNE210 <br />TUNNEL LEVEL PARTIAL FMCS FLAN <br />-- - <br />0 <br />40-034-1 E64 <br />1 E64 <br />PARTIAL FIRST FLOOR 203Y/120V POWER PLAN <br />0 <br />40®0®1 E214 <br />1 E214 <br />PARTIAL FIRST FLOOR EMCS PLAN <br />0 <br />40®034WE541 <br />E541 <br />LEAK DETECTION SYSTEM AND DETAILS <br />0 <br />40-034®E700 <br />E700 <br />SUMP LEAK DETECTION PANEL CONTROL WIRING DIAGRAM <br />"0579 <br />f ' <br />INCLUDED <br />IN SET <br />DRAWING NO. <br />SHEET NO. <br />DRAWING TITLE <br />REV <br />BUILDING <br />ARCHITECTURAL <br />STRUCTURAL <br />CIVIL <br />MECHANICAL REMOVAL <br />PROCESS - _FLOW DIAGRAMS <br />PIPINGINSTRUMENTATION D <br />MECHANICAL <br />ELECTRICAL <br />LEAK DETECTION <br />0 <br />4®035m TNE213R <br />TNE213R <br />EMCS PLAN ® TUNNEL VIEW - REMOVAL <br />® <br />40-035-TNE222R <br />TNE222R <br />EMCS PLAN - TUNNEL VIEW - REMOVAL <br />0 <br />40-035-TNE72 <br />TNE72 <br />TUNNEL 206Y/120V POWER PLAN <br />0 <br />40-035- TNE213 <br />TNE213 <br />FMCS PLAN - TUNNEL VIEW <br />0 <br />40-035-TNE222 <br />TNE222 <br />EMCS PLAN - TUNNEL VIEW <br />0 <br />40-035-E549 <br />E549 <br />LEAD DETECTION SYSTEM AND DETAILS <br />® <br />40m 35-E700 <br />E700 <br />SUMP LEAD DETECTION PANEL CONTROL WIRING DIAGRAM <br />INCLUDED <br />IN SET <br />DRAWING NO. <br />SKEET NO. <br />DRAWING TITLE <br />REV <br />BUILDING <br />ARCHITECTURAL <br />STRUCTURAL <br />II <br />MECHANICAL REMOVAL <br />-PROCESS <br />FLOWDIAGRAMS <br />PIPINGINSTRUMENTATION IA <br />MECHANICAL <br />- - <br />- - <br />ELECTRICAL <br />LEAK DETECTION <br />0 <br />40-036-T E21 OR <br />TNE21 OR <br />EMCS P IN - TUiNNEL VIEW - RE OVAL <br />0 <br />40-036-TNE219R <br />T E219R <br />EMCS PLAIN - TUNNEL VIEW - REMOVAL <br />0 <br />40-037-OE222R <br />OE222R <br />TUNNEL LEVEL PARTIAL EMCS PLAN - REMOVAL <br />0 <br />40-0 6-TNE210 <br />TNE210 <br />FMCS P N e TUNNEL VIE <br />0 <br />40-036-TNE219 <br />TNE219 <br />EMCS PLAN - TUNNEL VIEW <br />0 <br />40-0 7-OE222 <br />OE 22 <br />TUNNEL LEVEL PARTIAL EMCS PLAN <br />0 <br />40-036-E537 <br />E537 ILEAK <br />DETECTION SYSTEM AND DETAILS <br />ACCEPTABILITY <br />THIS DESIGN OR <br />SPECIFICATION IS APPROVED <br />t_ <br />Solon <br />D C N ? <br />APRIL 30,2021 <br />PRELIMINARY <br />-OR REVIEW OR <br />AFORMATION ONLY <br />NOT FOR CONSTRUCTION <br />DRAWING REVISION <br />SEE SPECIFIC DRAWING <br />FOR NATURE OF <br />REVISION <br />�urrttivi "r—v...... <br />20$0$46� <br />'rrvoDvL <br />A <br />ur <br />SHEET <br />G1-1 <br />JOB NO. <br />20808468 <br />Ct <br />SITE <br />DWG NO. 40-YD-Gl -0 <br />Nw. <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.