Laserfiche WebLink
MATCHLINE SEE DWG 40—YD—E210-47 <br />g iqq 1"A q <br />4 4 <br />/A! ff /aj4l <br />gl <br />Qj f, <br />L A <br />LEAK SENSOR Y—S6 <br />8 12 E21 08-12 ' 52 M5 <br />LEAK SENSOR Y—S5 <br />E210' 5211v`158-12 <br />1 "C, <br />BELDEN CAT #8770+--- <br />fF <br />EZ1 0 5AE2do -500T <br />L <br />cl-A 3 2 3/4"C, (1) 3/" <br />BELDEN CAT #8770'L--�,�, <br />LLJ <br />— --- ------ <br />L.Lj <br />!77-- <br />X <br />F, <br />E21 0-52 E2d0-501T <br />-A <br />L <br />x ------ — --------- x x x x <br />L� <br />< SYM I REVISION <br />ck, <br />— — PIW UPGRADES ADDENDUM A — DCN-01 <br />12cV <br />LEAK SENSOR Y—S10— <br />Q) <br />Aol <br />gy 5p, <br />v 2M <br />R <br />, I <br />--- ----------- <br />it t <br />z T <br />0r it i <br />\- " <br />, <br />, <br />7 <br />\'x <br />7T <br />it <br />0 < Z <br />L <br />x <br />< <br />XA <br />BLEAK SENSOR Y—S <br />—7 <br />A� <br />E210-52 538-0�z �5) <br />X:/ <br />Lo <br />r <br />LEAK SENSOR Y—S6 <br />I. <br />Lu <br />r8 C) <br />F <br />E21 0 L��M 5 8 _O 7; <br />3 <br />� <br />LEAK SENSOR Y—S9 <br />V <br />EZZ <br />7- <br />18 ------- <br />df <br />z 8 <br />10 =5 2 HM5 0 8 — 13 E2/ <br />L—Li <br />0 E V) <br />ED E-7 1- <br />C LLJ <br />FD El FD 1—j.max ---I r—, <br />IN1 Slop <br />N <br />R <br />an <br />— ------- ---- <br />c- Fj L-1 <br />-71 -------- F J El, <br />F <br />Z// o I itll- <br />slop <br />�Zll <br />s / ///,�/ /, / �i L <br />A <br />J�i <br />i F71 r/71it <br />@ Y <br />LAI <br />xx x — --------------- X-- <br />x ---- -- — <br />----------- <br />62" <br />------- <br />— ------ <br />— — ---- -- ------- <br />----- ------ <br />7— <br />— ----- -- ----- <br />— ------ ------ <br />— ------- <br />---------- <br />- ---- ----- <br />40 20 0 20 <br />40 80 DCN-01 <br />PARTIAL <br />PLAN <br />SCALE: 1 40' <br />N <br />SCALE: 1:40 <br />APRIL 30, 2021 <br />By <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />E- C <br />WA& I z <br />0 <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY DEPT. DATE <br />DRANJN <br />J. 0"MALLEY <br />CHECKED <br />ENGINEER <br />CHECKED <br />®ATE <br />03.08.07 <br />SUBTITLE <br />PARTIAL YARD EMCS PLAN <br />20808468 <br />CASNE <br />EEK <br />04.30.21 <br />— <br />TITLE <br />PIW UPGRADES ADDENDUM A — DCN-01 <br />35276 <br />IST <br />L ®Q <br />APPROVED <br />APPROVED <br />S I `E 40-YD <br />JELECTRICAL MASTER <br />LEGEND <br />E200-500T ENLARGED TUNNEL EMCS PLAN <br />E200-501 T ENLARGED TUNNEL EMCS PLAN <br />M538-03 LEAK DETECTION SYSTEM DETAILS <br />M538-12 <br />40-051 —1 E21 6 LEAK DETECTION PANEL Y <br />40-051 —E703 LEAK DETECTION CONTROL WIRING <br />DIAGRAM (Y) <br />,GENERAL NOTES <br />PROVIDE AND INSTALL LEAK SENSOR. SEE M538-03, <br />M538-12 FOR DETAILS. <br />L2 PROVIDE AND INSTALL CONDUCTORS, CONDUIT, AND ALL <br />REQUIRED HARDWARE TO CONNECT LEAK SENSORS TO <br />PNEUMERCATOR PANEL. <br />L�LEAK SENSOR TO BE INSTALLED IN LATER PHASE BY <br />OTHERS. COORDINATE CONDUIT ROUTING AND ELEVATION <br />TO THIS SENSOR WITH PROJECT ENGINEER, <br />CONSTRUCTION NOTES <br />00 <br />01 <br />02__ <br />03 <br />06 <br />04 - <br />07---, <br />05 <br />"08 <br />09 <br />10 <br />1 J() <br />112 <br />13 <br />14 <br />15 <br />16 <br />—18 <br />20 <br />Ir <br />j, <br />J23 <br />- 2 <br />25 <br />Lo <br />6J <br />Jj <br />28 <br />it 29 <br />30�,-�j al, <br />34 <br />Al <br />T <br />II <br />-3 <br />4 <br />55"! <br />KEY PLAN <br />SCALE: NONE <br />ffCASNE Engineering <br />0- <br />3545 FACTORIA BOULEVARD SE., SUITE 200 cl, <br />BELLEVUE, WA 98006 Lf, <br />(4-25) 522-1000 WWW.CASNECOM JOB NO. 191-089 cr. <br />CURRENT REVISI©N SYMBOL ®ATE <br />20808468 04.30.21 <br />� SHEET <br />E210-52 <br />JOB NO. COMP NO. <br />20808468 <br />EVERETT, WA DWG NO. 40—YD—E210-52 <br />10ADIED Q[)ArrI CrC. An Vn rr) in nmr, <br />