Laserfiche WebLink
CD <br />Lu <br />I <br />cr <br />LLJ <br />LLJ <br />f <br />V) <br />0 <br />V) <br />f <br />a <br />L <br />ol <br />t� <br />i <br />01 <br />I <br />I <br />i� <br />I <br />tea <br />r� <br />V <br />w <br />8E <br />c� <br />I <br />04 <br />f <br />cv <br />C <br />py9 <br />ZyD <br />I <br />m <br />0 <br />d <br />I <br />w <br />w <br />i <br />REPLACED RECORDREVISION <br />REPLACE HARDWARE DRAWING <br />DAMAGEDR <br />- <br />UPGRADE AI,SEISMIC UPGRADES — RECORD <br />- <br />PARTIAL FIRST <br />FLOOR PLAN <br />GENERAL NOTES <br />1. WHERE A NEWLY CONSTRUCTED WALL OR PARTITION IS <br />INDICATED TO BE PAINTED, PAINTING SHALL EXTEND <br />TO THE NEAREST WALL TRANSITION IN ALL DIRECTIONS. <br />2. SEE DOOR SCHEDULE AND 087100- FURTHER <br />OR <br />INFORMATION <br />:Ai REPAIR OR REPLACEMENT <br />FRAMES AND/OR <br />DOOR HARDWARE. <br />R HARDWARE <br />LOCATED ABOVE FIRST — i., <br />EXCEEDWALL MOUNTED SIGN: HAZARDOUS MATERIAL STORAGE <br />NOT TO MAX. ALLOWANCE QUANTITIES AND/OR <br />USE —OPEN QUANTITIES PER ! <br />1-®HR MALL (METAL STUD 24" O.C. WITH 5/6" GWB <br />BOTH SIDES) NORTH OF EXISTING DUCT. <br />6 SPILL BLADDERS (OFOI). <br />SPILL ABSORPTION PAD (OFOI). <br />B > SHELVING UNITS. <br />Y X <br />a �I� L i Irvv .- f s i �; I <br />BY APPROVED DATE SYM REVISION BY APPROVED DATE BRAWN DATE SUBTITLE <br />ACCEPTABILITY JM 06.05.2012 <br />FA810288 RMR RMR 09,15>01 F 40-051 HAZARDOUS CONTAINMENT COMP.-100%IFC 19059373 MH Sw 10.14.16 THIS DESIGN AND/OR CHECKED PARTIAL FIRST FLOOR PLAN <br />555672-04 DLR GROUP S 09 30.05 - SPECIFICATION IS APPROVED KS 06.05.2012 <br />J <br />L C PIW UPGRADES ADDENDUM A 20�0�466 SITTS DKL 01.25.21 APPROVE �Y DEPT. ®ATE KS I 06.05,2012 TITLE PIW UPGRADES ADDENDUM A <br />586106 00 JMP WRL 04.22.08 CHECKED <br />SW -- APPROVED 06.05.2012BUILDING 40-051 <br />W750837 MH SW 05.14.2102 SW 06.05.2012 <br />ify v��� - APPROVED <br />11519430 MH SW 10.01.15 ARCHITECTURAL. MASTER COL, BK—D/1 —3 <br />D SPILL CONTROL CURB. <br />CONSTRUCTION NOTES <br />1. FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRI <br />TO START OF CONSTRUCTION. <br />2. VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION <br />WHICH AFFECT NEW CONSTRUCTION PRIOR TO <br />SUBMITTAL OF SHOP DRAWINGS, SHOP DRAWINGS <br />WITHOUT FIELD VERIFICATION OF DIMENSIONS SHALL <br />BE REJECTED, <br />3. COORDINATE STRUCTURAL WORK WITH MECHANICAL <br />AND ELECTRICAL DRAWINGS. <br />4, DO NOT SCALE DRAWINGS, <br />REFI,gI;\CF i)RA6"vCNC:; <br />1 �� � A,i <br />SOME: NONE <br />--- - <br />sI tts h I <br />pp <br />CIVIL I <br />STRUCTURAL I SURVEY <br />4815 CENTER STREET I TACOMA, WA. 98409 <br />PHONE: (253) 474-9449 I PAX: (253) 474-0153 <br />http://www.sittshill.com/ <br />Project No,. <br />17659 <br />Project Mgr.: OKL <br />Proj, Engineer: <br />SDS <br />Proj. Drafter; JDK <br />RrIvIalwil 3TMOvL U�t� <br />2080846� 01.25.21 <br />SEQUENCE NO. <br />40-051 m 1 A16 <br />