1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL ON -SIT AND <br />SHALL COORDINATE ALL ACTIVITIES WITH THE OWNER AND ENGINEER A MINIMUM OF TWO <br />(2) WEEKS IN ADVANCE OF THE BEGINNING OF WORK, THE CONTRACTOR IS RESPONSIBLE <br />FOR PROVIDING ALL TRAFFIC CONTROL SIGNS. SAFE VEHICULAR AND PEDESTRIAN ACCESS <br />SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. SHUTDOWN OF OWNER <br />OPERATION OR ACCESS WILL NOT BE PERMITTED. A MINIMUM OF ONE DRIVING LANE <br />SHALL REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION. <br />2. THE LOCATION OF ALL UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. THE <br />CONTRACTOR SHALL VERIFY THE EXISTING UTILITIES PRIOR TO EXCAVATION. TO LOCATE <br />OFF -SITE UTILITIES, CALL THE UNDERGROUND LOCATE LINE AT 811, FOR ON -SITE <br />UTILITIES CONTACT BOEING PM FOR RECOMMENDATIONS. <br />3. WHERE CONFLICTS OCCUR BETWEEN EXISTING FEATURES AND THE PLACEMENT OF NEW <br />FACILITIES, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BY THE <br />CONTRACTOR, AND WILL BE RESOLVED BY THE ENGINEER. <br />4. THE CONTRACTOR FOR THIS PROJECT SHALL MAINTAIN A CLEAN, LEGIBLE SET OF THESE <br />PLANS AND NOTE ALL DEVIATIONS THEREON. UPON COMPLETION OF CONSTRUCTION, <br />THESE DRAWINGS SHALL BE DELIVERED TO THE ENGINEER FOR THE PREPARATION OF <br />RECORD DRAWINGS. <br />5. THE CONTRACTOR SHALL HAVE THE FOLLOWING DOCUMENTS AT THE JOB SITE AT ALL <br />TIMES DURING CONSTRUCTION: <br />5.1. CURRENT COPY OF WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) <br />STANDARD PLANS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (PUBLICATION <br />M21-01) <br />5.2. CURRENT EDITION OF WASHINGTON STATE DEPARTMENT OF TRANSPORTATION <br />(WSDOT) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL <br />CONSTRUCTION (PUBLICATION M41-10) <br />6. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT TO PREVENT UTILITY <br />INTERRUPTION. NOTIFY THE BOEING COMPANY ONE WEEK IN ADVANCE OF EACH UTILITY <br />INTERRUPTION. <br />7. PRIOR TO BIDDING, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO MAKE ALL <br />NECESSARY SITE INSPECTIONS AND DETERMINATIONS OF ITEMS AND QUANTITIES OF WORK <br />TO ENSURE THAT ALL ITEMS OF WORK NECESSARY TO PERFORM A COMPLETE AND <br />ACCEPTABLE JOB HAVE BEEN TAKEN INTO CONSIDERATION. <br />8. BOEING'S SINGLE POINT OF CONTACT THROUGHOUT THE PROJECT WILL BE BOEING'S <br />CONSTRUCTION ADMINISTRATOR, WHO WILL BE IDENTIFIED AT THE PRE -CONSTRUCTION <br />N WALK-THROUGH MEETING. <br />< <br />9. <br />EXISTING LANDSCAPE AREAS TO REMAIN WHICH ARE DISTURBED DURING CONSTRUCTION <br />ARE TO BE RESTORED TO ORIGINAL CONDITION. <br />CO"NSTRUu_`TI0`N' <br />C14 <br />nt <br />1. <br />COORDINATE TRAFFIC CONTROL PLAN AND ENVIRONMENTAL PROCEDURES WITH OWNER AND <br />ENGINEER PRIOR TO BEGINNING WORK, <br />2. <br />HOLD THE PRE -CONSTRUCTION MEETING WITH CITY OF EVERETT OFFICIALS AND OWNER OR <br />OWNER'S REPRESENTATIVE. <br />Lu <br />3. <br />POST SIGN WITH NAME AND PHONE NUMBER OF EROSION AND SEDIMENT CONTROL (ESC) <br />V <br />L SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION <br />I <br />SIGN). <br />4. <br />FLAG OR FENCE CLEARING LIMITS, INSTALL TRAFFIC CONTROL DEVICES AND INSTALL <br />EROSION CONTROL MEASURES. <br />5. <br />REMOVE SURFACE FEATURES, ASPHALT AND CONCRETE PAVEMENT, AND UTILITIES PER THE <br />APPROVED PLANS. <br />0 <br />6. <br />INSTALL NEW UTILITY TRENCH PER THE APPROVED PLANS. <br />cn <br />I # 7. INSTALL STRUCTURAL FILL TO FINISHED SUBGRADE AND PAVE SURFACES ADJACENT TO <br />v I NEW TRENCH. <br />v <br />8. <br />MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND <br />® <br />MANUFACTURER'S RECOMMENDATIONS, <br />�t- <br />9. <br />STABILIZE ALL AREAS WITHIN SEVEN DAYS OF COMPLETION OF EARTHWORK ACTIVITIES. <br />c� <br />10, <br />UPON COMPLETION OF THE PROJECT, STABILIZE ANY REMAINING DISTURBED AREAS AND <br />® <br />REMOVE BMP'S IF APPROPRIATE. <br />QD <br />11. <br />REMOVE TRAFFIC CONTROL, EROSION CONTROL, AND POLLUTION PREVENTION MEASURES <br />UPON APPROVAL FROM CITY INSPECTOR AND OWNER. <br />NO"TES <br />I <br />1. <br />WATTLES SHALL BE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-14.5(5). <br />INSTALL WATTLES ALONG CONTOURS. INSTALLATION SHALL BE IN ACCORDANCE WITH <br />® <br />WSDOT STANDARD SPECIFICATION 8-01.3(10). <br />2. <br />SECURELY KNOT EACH END OF WATTLE, ABUT ADJACENT WATTLES TIGHTLY, END TO <br />END, WITHOUT OVERLAPPING THE ENDS. <br />3. <br />PILOT HOLES MAY BE DRIVEN THROUGH THE WATTLES AND INTO THE SOIL WHEN <br />g <br />CONDITIONS REQUIRE. <br />u <br />nc <br />4. <br />WATTLES SHALL BE INSPECTED REGULARLY, AND IMMEDIATELY AFTER A RAINFALL <br />rl <br />CD <br />PRODUCES RUNOFF, TO ENSURE THEY REMAIN THOROUGHLY ENTRENCHED AND IN <br />CONTACT WITH THE SOIL. <br />5. <br />PERFORM MAINTENANCE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION <br />8-01.3(15). <br />I <br />CDSu"ILS s <br />1. STOCKPILING OF EXCAVATED SOILS SHALL BE COORDINATED WITH BOEING. SEPARATION OF <br />STOCKPILES, CONTAINMENT AND DISPOSAL OF SOILS OFF -SITE SHALL BE COORDINATED <br />Or <br />THROUGH BOEING ENVIRONMENTAL SERVICES. CONTRACTOR SHALL ABIDE TO BOEING <br />DIRECTIVES. <br />r 2. SEE STOCKPILE NOTES ON SHEET C2C. <br />(l7 <br />Cn <br />L <br />0 <br />CD SYM REVISION ( BY APPROVED DATE <br />ORIG PIW UPGRADES ADDENDUM A 20808468 SITTS BKL 01.25.21 <br />m <br />r� <br />i <br />CD <br />Co <br />PLASTIC COVERING NOTES (AS REQUIRED <br />1. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE <br />REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION 9-14.5(3). <br />2. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS <br />OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL <br />SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT <br />LEAST A 12-INCH OVERLAP OF ALL SEAMS. <br />3. CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN <br />NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED. <br />4. WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE <br />UNTIL THE NEXT SEEDING PERIOD. <br />5. PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN <br />ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS. <br />6. PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. <br />CB PROTECTI TES <br />1. CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS NOTED ON THE <br />PLANS. <br />2. AT ALL PROPOSED CATCH BASINS, CATCH BASIN PROTECTION SHALL BE INSTALLED <br />IMMEDIATELY UPON CATCH BASIN INSTALLATION AND SHALL REMAIN UNTIL FINAL SITE <br />STABILIZATION. <br />3. CATCH BASIN INSERT SHALL BE STREAMGUARD SEDIMENT CATCH BASIN INSERT *3003, <br />ULTRA -DRAIN GUARD *9217, OR APPROVED EQUAL. <br />4. CATCH BASIN INSERTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS, AND MAINTAINED TO OPERATE PROPERLY. <br />5. CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION <br />AND STABILIZATION OF ALL CLEARED AREAS. <br />Pu"LLUTIO"N PR <br />1. EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT AN APPROVED <br />OFF -SITE LOCATION. WHEN FEASIBLE COORDINATE THE LOCATION OF ON -SITE <br />LUBRICATION AND FUELING AREA WITH BOEING ENVIRONMENTAL GROUP -SEE CONTACT <br />BELOW. <br />2. PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER <br />CONTAINMENT DEVICES. <br />3. ACCESS TO CONSTRUCTION IS VIA ADJACENT EXISTING PAVED STREETS. SWEEP DIRT <br />FROM PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS FROM <br />VEHICLES AND EQUIPMENT FROM BEING DEPOSITED ON BOEING-OWNED STREET AND CITY <br />STREET PAVEMENT. <br />4. SPILL CLEANUP PROCEDURES SHALL BE POSTED ON -SITE. IN CASE OF A SPILL THAT <br />MAY ENTER GROUNDWATER, SURFACE WATER, OR STORM DRAIN SYSTEM, CONTACT BOEING <br />EMERGENCY AT (206) 655-2222. SPILLS MUST BE CLEANED UP IMMEDIATELY AND <br />CONTAMINATED MATERIAL DISPOSED OF PROPERLY. <br />5. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM <br />ENTERING THE STORM DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR <br />PROVIDING ADEQUATE CONTAINMENT / SEPARATION AT ALL TIMES. ALL STORMWATER <br />POLLUTION PREVENTION MEASURES SHALL BE COORDINATED WITH ENVIRONMENTAL <br />ENGINEERING TO ENSURE COMPLIANCE WITH APPLICABLE STORMWATER PERMITS. CONTACT <br />RON GRINA AT (425) 328-8148 TWO (2) WEEKS PRIOR TO THE START OF <br />CONSTRUCTION. <br />6. THE CONTRACTOR SHALL CONDUCT A DAILY STORMWATER / ENVIRONMENTAL INSPECTION <br />OF THE CONSTRUCTION SITE. SCOPE OF THE INSPECTION WILL BE COORDINATED WITH <br />RON GRINA AT (425) 328-8148. <br />7. THE CONTRACTOR SHALL FOLLOW ALL ENVIRONMENTAL AND OTHER REQUIREMENTS AS <br />DEFINED IN THE BOEING SERVICE PROVIDER MANUAL (AVAILABLE UPON REQUEST). <br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL EXCAVATIONS. ALL WATER <br />GENERATED FROM DEWATERING OPERATIONS SHALL BE DISPOSED OF IN MANNER AND <br />LOCATION APPROVED BY BOEING ENVIRONMENTAL. THE CONTRACTOR SHALL PREPARE AND <br />SUBMIT A DEWATERING PLAN PRIOR TO COMMENCING CONSTRUCTION. <br />2. CONTRACTOR TO ANTICIPATE GROUNDWATER WITHIN 5 FEET OF SURFACE AND PROVIDE <br />ALL EQUIPMENT NECESSARY TO DE -WATER EXCAVATIONS. COORDINATE DISCHARGE WITH <br />OWNER IN TRAFFIC AREAS AND NEAR OPERATIONAL FACILITIES (I.E. SURFACE PIPING IS NOT <br />ACCEPTABLE WITHOUT APPROPRIATE, APPROVED TRAFFIC CONTROL MEASURES). <br />3. ALL GROUNDWATER WILL BE TREATED DEPENDING ON CONTAMINANTS AND DISCHARGED <br />TO THE SANITARY SEWER SYSTEM, A WASTE DISCHARGE AUTHORIZATION WILL BE <br />OBTAINED BY ENVIRONMENTAL AFFAIRS FOR THIS DISCHARGE. ALLOW 4-6 WEEKS <br />TO OBTAIN THIS PERMIT. <br />4. NO SEDIMENT, TURBID WATER, OR OTHER POLLUTANTS (HEAVY METALS, OIL SHEEN, ETC.) <br />SHALL BE DISCHARGED TO THE ON -SITE STORMWATER SYSTEM. ANY TREATMENT OF <br />COLLECTED WATER SHALL BE APPROVED BY BOEING ENVIRONMENTAL ENGINEERING PRIOR TO <br />DISCHARGE. <br />5. ANY DISCHARGE TO THE SANITARY SEWER SYSTEM WILL REQUIRE PRIOR COORDINATION <br />WITH BOEING ENVIRONMENTAL ENGINEERING TO ESTABLISH SAMPLING PROTOCOL, DISCHARGE <br />VOLUMES, AND NOTIFICATION TO CITY OF EVERETT. <br />6. A LOG OF ALL DISCHARGED STORMWATER SHALL BE KEPT ON -SITE AT ALL TIMES DURING <br />CONSTRUCTION. AT A MINIMUM, THE LOG SHALL CONTAIN THE FOLLOWING ITEMS: <br />DATE DISCHARGED <br />® SOURCE OF WATER (VAULT, PIPE, ETC.) <br />® TYPE OF WATER DISCHARGED (GROUNDWATER, STORMWATER, ETC.) <br />METHOD OF COLLECTION (PUMP TO TANK, ETC.) <br />METHOD OF DISCHARGE (DRAIN FROM TANK, PUMPED DISCHARGE, ETC.) <br />® VOLUME OF WATER DISCHARGED <br />® DISCHARGE LOCATION <br />® RECEIVING SYSTEM (ON -SITE STORM SYSTEM, SEWER, OFF -SITE FACILITY, ETC.) <br />® DURATION OF DISCHARGE <br />7. ANY STORMWATER COLLECTED INTO A TRUCK SHALL NOT BE DISCHARGED TO THE <br />STORMWATER SYSTEM. <br />8. THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM BOEING ENVIRONMENTAL <br />ENGINEERING FOR ANY OFF -SITE DISPOSAL OF WATER, SEDIMENT, OR DEBRIS. <br />SYM <br />J <br />1. ON -SITE EROSION MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY <br />PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE OF THE STORM SYSTEM BY THE <br />OWNER SHALL BE CORRECTED BY THE CONTRACTOR. <br />2. IN CASE EROSION OR SEDIMENTATION OCCURS ON ADJACENT PROPERTY, ALL <br />CONSTRUCTION WORK WITHIN THE DEVELOPMENT THAT WILL AGGRAVATE THE SITUATION <br />MUST CEASE AND THE CONTRACTOR SHALL IMMEDIATELY COMMENCE RESTORATION OR <br />MITIGATION METHODS. RESTORATION ACTIVITY WILL CONTINUE UNTIL SUCH TIME AS THE <br />PROBLEM IS RECTIFIED. <br />3. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS SHALL <br />BE INSTALLED PRIOR 'TO OR AS THE FIRST STAGE OF SITE PREPARATION. <br />4. SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN <br />ON THESE DRAWINGS NOT PROVE ADEQUATE TO CONTROL EROSION AND SEDIMENTATION, <br />THE CONTRACTOR SHALL INSTALL LOOSE STRAW, SILT FENCE, SEDIMENT TRAP OR <br />ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE <br />AREAS, NATURAL WATER COURSES AND / OR STORM DRAINAGE SYSTEMS. <br />5. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION OR EXPERIENCED LAND <br />DISTURBING ACTIVITIES AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD <br />EXCEEDING 5 DAYS, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH <br />MULCHING, GRASS, PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT <br />APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE <br />ACCEPTABLE ONLY DURING THE MONTHS OF MAY THROUGH SEPTEMBER INCLUSIVE. <br />DURING WET SEASON SEEDING MAY PROCEED, HOWEVER, IT IS IN THE INTEREST OF THE <br />CONTRACTOR THAT IT MUST BE AUGMENTED WITH MULCHING. <br />6. THE CONTRACTOR'S LICENSED SURVEYOR WILL BE RESPONSIBLE FOR FIELD LOCATING <br />THE CLEARING LIMITS AND ESTABLISHING THOSE BOUNDARIES WITH BRIGHT COLORED <br />FLAGGING, PAINT, FENCING, OR OTHER VISIBLE MEANS. THE CONTRACTOR SHALL CLEAR <br />TO THE LIMITS AS ESTABLISHED ON THIS PLAN AND AS MARKED IN THE FIELD. <br />7. ALL WORK ASSOCIATED WITH STABILIZING THE DISTURBED AREAS SHALL BE IN <br />ACCORDANCE WITH CURRENT CITY OF EVERETT STANDARDS. <br />8. ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON -SITE TO PREVENT DEBRIS, DUST <br />AND MUD FROM ACCUMULATING ON BOEING STREETS AND THE PUBLIC RIGHT-OF-WAY. <br />9. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING EROSION CONTROL MEASURES <br />FUNCTIONING, AFTER EACH DAY OF RAINFALL, THE CONTRACTOR SHALL INSPECT THE <br />EROSION CONTROL FACILITIES FOR DAMAGE. IF DAMAGE HAS OCCURRED TO ANY OF THE <br />FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY MAKE ANY NECESSARY REPAIRS IN <br />CONFORMANCE WITH THE APPROVED PLANS. <br />10. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE SITE'S CONSTRUCTION <br />STORMWATER GENERAL PERMIT. <br />1, STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED <br />MEASURE) DAILY BETWEEN OCTOBER 1 AND MARCH 31. <br />2. IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. <br />3. TOPSOILS SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE <br />SUBGRADE IS EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE <br />DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. <br />4, PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE <br />MAINTAINED ACCORDING TO THE APPROVED PLAN. <br />1 llllffl,� m"ars =�__ <br />1. REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE INCLUDING VEGETATION, SCRAP <br />WOOD, TRASH, ETC. AND DISPOSE OF AT AN APPROVED OFF -SITE LOCATION. <br />2. AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES, FENCING, OR <br />OTHER MEASURES TO ENSURE CONTINUOUS PROTECTION OF THE PUBLIC AND TO <br />PREVENT UNAUTHORIZED ENTRY TO THE CONSTRUCTION AREA. AT A MINIMUM FENCING <br />SHALL BE 6.0 FEET HIGH. COORDINATE SAFETY AND SECURITY MEASURES WITH <br />ADJACENT WORK. <br />3. DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES, <br />VEHICLES, FENCING, OR LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES WILL <br />BE REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING <br />SURVEY MONUMENTS AND OTHER SURVEY MARKERS DURING CONSTRUCTION, ALL SUCH <br />MONUMENTS OR MARKERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT <br />THE CONTRACTOR'S EXPENSE TO ORIGINAL LOCATION AND ELEVATION. <br />5. THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR REPAIR OF <br />OFF -SITE AND ON -SITE PAVED SURFACES WHERE DAMAGE HAS BEEN SUSTAINED <br />BECAUSE OF CONSTRUCTION TRAFFIC. <br />6. ALL CONCRETE, PAVEMENT, CURBS, SIDEWALKS AND RAMPS INDICATED TO BE REMOVED <br />OR REPLACED SHALL BE REMOVED TO THE NEAREST EXPANSION JOINT AS IDENTIFIED <br />DURING CONSTRUCTION. WHERE THIS IS NOT POSSIBLE DUE TO CONFLICTS OR <br />ADJACENT DAMAGED CONCRETE / ASPHALT, THE CONTRACTOR SHALL MAKE A FULL <br />PAVEMENT DEPTH SAWCUT AT THE PROPOSED JOINT IN SOUND PAVEMENT. PROPOSED <br />CONCRETE / ASPHALT SHALL EXTEND TO THE SAWCUT EDGE AND BE APPROPRIATELY <br />JOINED / SEALED. THE CONTRACTOR SHALL MAKE SAWCUTS AT EXISTING CONTRACTION <br />JOINTS WHERE POSSIBLE, <br />7. TO THE MAXIMUM EXTENT POSSIBLE, THE CONTRACTOR SHALL SALVAGE AND REUSE ALL <br />CATCH BASIN FRAMES, GRATES, COVERS, MANHOLE LIDS AND ANY OTHER EXISTING <br />METAL WORKS IN PAVEMENTS DESIGNATED FOR REMOVAL / REPLACEMENT. <br />8. DEMOLISHED MATERIALS NEED TO BE STOCKPILED AND TESTED (ASBESTOS, LEAD AND <br />OTHER CONTAMINANTS) BY EHS PRIOR TO REMOVAL. ONCE CLEARED, ALL DEMOLISHED <br />/ REMOVED MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR, AND SHALL BE <br />REMOVED FROM THE SITE AND PROPERLY DISPOSED. THIS INCLUDES DEMOLISHED <br />PAVEMENT AND EXCAVATED GRANULAR MATERIAL. <br />CRUSHED ROCK NOTES <br />1. TOP COURSE OR CRUSHED SURFACING TOP COURSE (CSTC) SHALL CONFORM TO WSDOT <br />9-03.9(3) REQUIREMENTS. <br />2. BASE COURSE OR CRUSHED SURFACING BASE COURSE (CSBC) SHALL CONFORM TO <br />WSDOT 9-03.9(3) REQUIREMENTS. <br />CONCRETE PAVEMENT NOTES <br />CONCRETE PAVEMENT CONSTRUCTION SHALL CONFORM TO WSDOT STANDARD SPECIFICATION <br />SECTION 5-05 AND CURRENT ACI, EXCEPT AS MODIFIED HEREIN. <br />2, MINIMUM STRENGTH OF CONCRETE SHALL BE AS FOLLOWS: <br />TYPE <br />28-DAY COMPRESSIVE <br />14-DAY FLEXURAL <br />HEAVY DUTY CONCRETE <br />SUBMIT PER 5-05.3(1) <br />(5,400 PSI MINIMUM) <br />650 PSI <br />3. MAXIMUM WATER/CEMENT RATIO (W/C) SHALL BE 0.44 FOR HEAVY DUTY PAVEMENT. <br />MINIMUM CEMENTITIOUS MATERIAL SHALL DE 564 LBS/CY. USE 19% MINUS COARSE <br />AGGREGATE FOR CONCRETE SIX INCHES THICK AND GREATER; USE 3/4" MINUS COARSE <br />AGGREGATE FOR THINNER SECTIONS. ALL HEAVY DUTY CONCRETE PAVEMENT SHALL BE <br />FIBER -REINFORCED AND BE AIR -ENTRAINED (5.5% + 1.5%). MAXIMUM SLUMP SHALL BE 4 <br />INCHES. <br />4. UNLESS APPROVED OTHERWISE IN WRITING BY THE ENGINEER, ALL CONCRETE SLABS ON <br />GRADE SHALL BE BOUND BY SAWCUT (CONTRACTION) CONTROL JOINTS AND CONSTRUCTION <br />JOINTS SUCH THAT THE ENCLOSED AREA DOES NOT EXCEED 400 SQUARE FEET AND <br />LENGTH TO WIDTH RATIO OF 1.2:1. TRANSITION TO EXISTING WITH DOWELS PER PLAN. <br />5. FIBER REINFORCED CONCRETE SHALL CONTAIN 1.5 POUNDS PER CUBIC YARD "FIBERMESH <br />300" POLYPROPYLENE FIBERS BY PROPEX CONCRETE SYSTEMS, OR APPROVED EQUIVALENT. <br />ADD TO CONCRETE MIX PER THE MANUFACTURER'S INSTRUCTIONS. FIBERS SHALL <br />CONFORM TO ASTM C1116, TYPE III, <br />6. PRE -MOLDED JOINT FILLER SHALL BE PER WSDOT SPECIFICATION SECTION 9-04.1(2). <br />7. JOINT SEALANT SHALL BE DOW CORNING "890-SL", (JET FUEL RESISTANT), OR APPROVED <br />EQUAL. <br />8. FOAM BACKER ROD SHALL BE PER WSDOT SPECIFICATION 9-08.8. <br />9. CURING COMPOUND SHALL BE NON -YELLOWING EXTERIOR TYPE, WSDOT 9-23.2. <br />10. EPDXY SHALL_ BE HILTI HIT -RE 500 V3, HIT-HY 200 OR APPROVED EQUAL <br />11, CONCRETE MIX DESIGNS SHALL BE SUBMITTED TO BOEING CONSTRUCTION MANAGER FOR <br />DISTRIBUTION TO BOEING AND DESIGN TEAM FOR REVIEW AND APPROVAL. <br />12, ALL EPDXY BOLTS AND RODS SHALL HAVE ICC APPROVAL FOR MATERIAL INTO WHICH <br />INSTALLATION TAKES PLACE, INSTALLATION PER MANUFACTURE'S DIRECTIONS. <br />13. SAWCUT CONTRACTION JOINT SHALL BE "SOFT -CUT" SAWCUT-1/8" WIDEx1/4 SLAB <br />THICKNESS IN DEPTH. THE CUT SHALL BE MADE SOON ENOUGH TO PREVENT SHRINKAGE <br />CRACKING, BUT NOT TO CAUSE SPALLING OF THE CONCRETE WHILE SAWING. <br />WARRANTY <br />t ONE YEAR AFTER PROJECT COMPLETION CONTRACTOR AND OWNER REPRESENTATIVES <br />SHALL INSPECT SLAB FOR CRACKS. ALL CRACKS GREATER THAN 0.06" SHALL BE <br />CLEANED AND REPAIRED WITH EPDXY INJECTION. CURLED EDGES SHALL BE GROUND <br />DOWN. ROCKING SLABS SHALL BE REMOVED AND REPLACED IN THEIR ENTIRETY. <br />REINFONUING" FOR u"ONCRETE Nu"T <br />1. USE ASTM A615, GRADE 60 (FY = 60 KSI), DEFORMED BARS FOR ALL BARS. <br />2. ALL GRADE 60 REINFORCING TO BE WELDED SHALL BE ASTM A706. <br />3. WELDED WIRE REINFORCEMENT PER ASTM A185, WIRE PER ASTM A82. <br />4. NO TACK WELDING OF REINFORCING BARS ALLOWED WITHOUT PRIOR REVIEW OF <br />PROCEDURE WITH THE ENGINEER. ACI 318-11 SHALL APPLY, <br />5. CLEAR CONCRETE COVERAGES AS FOLLOWS: <br />CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH <br />3" <br />EXPOSED TO EARTH OR WEATHER <br />#6 OR LARGER <br />2" <br />5 AND SMALLER <br />1 1 2" <br />ALL OTHER <br />PER ACI 318-11 <br />6. DOWELS SHALL BE EPDXY COATED PER ASTM A1078 TYPE 2 AND TREATED WITH A <br />BOND RELEASE AGENT PRIOR TO JOBSITE DELIVERY. LENGTH AND DIAMETER PER <br />PROJECT DETAILS AND SECTIONS. <br />PAINT STI ING" NOT <br />1. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY <br />STRIPING/SIGNAGE NECESSARY TO MAINTAIN SAFE VEHICLE AND PEDESTRIAN TRAFFIC. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAINTING ALL LINES AND SYMBOLS <br />OBSCURED BY HIS WORK TO THE SATISFACTION OF THE OWNER. PRIOR TO <br />CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING STRIPING/SURFACE <br />OF EACH PAVEMENT SEGMENT TO BE RECONSTRUCTED. <br />3. THE CONTRACTOR SHALL LAYOUT ALL PROPOSED PAINT STRIPING FOR OWNER'S <br />REVIEW/APPROVAL PRIOR TO FINAL STRIPING. <br />4. COORDINATE STRIPING WITH THE BOEING COMPANY TO MATCH EXISTING STANDARD <br />STRIPING. RESTORED PAINT STRIPING SHALL MATCH EXISTING STRIPING WHERE DISTURBED. <br />MATCH COLOR, WIDTH, AND LINE TYPE (SOLID, DASHED, ETC) SPACING. <br />5. ALL PAVEMENT MARKINGS SHALL BE PAINT (WATERBORNE PAINT IS PREFERRED). ALL <br />PAVEMENT MARKINGS SHALL COMPLY WITH WSDOT SPECIFICATION 9-34 AND SHALL BE <br />APPLIED IN ACCORDANCE WITH WSDOT SPECIFICATION 8-22, ALL PAINT SHALL BE ON <br />WSDOT QPL (QUALIFIED PRODUCT LIST). <br />6. PAINT SHALL. BE APPLIED IN TWO APPLICATIONS: <br />6.1 FOR PAINTS APPLIED BY SPRAYER: THE FIRST PAINT APPLICATION SHALL BE <br />FOLLOWED BY THE APPLICATION OF 24 GRIT ALUMINUM OXIDE (FOR ANTI -SLIP <br />RESULTS) BROADCASTED ONTO A WET PAINT AT A MINIMUM RATE OF 5-7 LB PER <br />100 SQUARE FEET <br />6.2 FOR PAINTS APPLIED BY ROLLER: 24 GRIT ALUMINUM OXIDE SHALL BE MIXED <br />DIRECTLY INTO EACH GALLON OF THE FIRST PAINT APPLICATION <br />6.3 THE SECOND PAINT APPLICATION SHALL ALLOW THE FIRST APPLICATION TO DRY <br />OUT. THE TIME PERIOD BETWEEN PAINT APPLICATIONS SHALL BE IN ACCORDANCE <br />WITH WSDOT SPECIFICATION SECTION 8-22.3(3) AND VARY DEPENDING ON THE <br />TYPE OF PAVEMENT AND PAINT TYPE, <br />6.4 TWO COATS OF PAINT SHALL HAVE A MINIMUM THICKNESS OF 30 MILS. <br />7. LONGITUDINAL MARKING PATTERNS SHALL COMPLY WITH WSDOT STANDARD PLAN <br />M-20.10-02. TRAFFIC ARROWS SHALL COMPLY WITH WSDOT STANDARD PLAN <br />M-24.40-01. TRAFFIC LETTERS SHALL COMPLY WITH WSDOT STANDARD PLAN <br />M-80.30-00. <br />8. CROSSWALK AND STOP BAR MARKING PATTERNS SHALL COMPLY WITH WSDOT <br />STANDARD PLAN M-15.10-01 AND INCLUDE 24 GRIT ALUMINUM OXIDE, <br />SUBGRADE PREPARATION <br />1. ALL EXPOSED SUBGRADE SHALL BE PROOF ROLLED UNDER THE OBSERVATION OF THE <br />OWNERS INSPECTION / TESTING AGENCY WITH A LOADED 12 CY (MINIMUM) DUMP TRUCK <br />OR HEAVY COMPACTOR. ANY LOCALIZED ZONE OF YIELDING SUBGRADE SHALL BE <br />OVEREXCAVATED TO A MAXIMUM DEPTH OF 12" (OR AS DETERMINED BY THE OWNER'S <br />GFOTECHNICAL ENGINEER) AND REPLACED WITH STRUCTURAL FILL, COMPACTED TO 95% <br />MAX. DENSITY. REFER TO GEOTECHNICAL ENGINEERING REPORT BY TERRACON <br />CONSULTANTS, INC, DATED JANUARY 17, 2012 FOR MORE INFORMATION. <br />2. WHERE SUBGRADE CANNOT BE FEASIBLY SUBJECTED TO A PROOF --ROLL, COMPACTION <br />SHALL BE VERIFIED BY A MINIMUM OF ONE NON-DESTRUCTIVE FIELD DENSITY TEST (I.E. <br />NUCLEAR DENSOMETER) PER 2,000 SQUARE FEET, BUT IN NO CASE LESS THAN THREE <br />(3) TESTS. 1F ADDITIONAL COMPACTION IS REQUIRED, RE -TESTING OF SUBGRADE SHALL <br />BE AT CONTRACTOR'S EXPENSE. <br />3. GRAVEL BORROW/STRUCTURAL FILL SHALL BE PLACED IN LOOSE LIFTS NOT TO EXCEED <br />8-INCHES, MOISTURE CONDITIONED TO ACHIEVE OPTIMAL MOISTURE CONTENT FOR <br />COMPACTION, AND COMPACTED TO 95% MAX. DENSITY PER ASTM D-1557. <br />4. GRAVEL BORROW/STRUCTURAL FILL SHALL COMPLY WITH WSDOT STANDARD SPECIFICATION <br />9-03.14(1), MODIFIED FROM 7.0% TO 5,0% PASSING THE U.S. NO. 200 SIEVE. <br />5. CRUSHED SURFACING TOP COURSE (CSTC)/ BASE COURSE (CSBC) SHALL COMPLY WITH <br />WSDOT STANDARD SPECIFICATION 9-03.9(3). <br />6. OWNERS TESTING AGENCY'S FIELD REPORTS AND COMPACTION REPORTS WILL BE <br />DISTRIBUTED TO OWNER, ENGINEER, AND CONTRACTOR WITHIN TWO WEEKS OF FIELD <br />OBSERVATION. <br />7. SOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE <br />SUBGRADE IS EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE <br />DETRIMENTAL TO PROPER GRADING. <br />8. NON -WOVEN GEOTEXTILE FABRIC SHALL CONFORM WITH REQUIREMENTS OF SEPARATION <br />FABRIC PER TABLE 3 OF WSDOT SPECIFICATION 9-33.2(1). INSTALLATION OF FABRIC <br />SHALL CONFORM WITH WSDOT SPECIFICATION 2-12. <br />I'l , mwf <br />1011=1111 IN NO! <br />CITY OF EVER <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE <br />AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF <br />ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED <br />IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE <br />BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE <br />MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL <br />CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT <br />AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED <br />SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE <br />UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM <br />EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF <br />ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN <br />A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED <br />PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO <br />THE DOWNSTREAM SYSTEM. <br />9. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />SEDIMENT TRACKED OFF THE SITE. <br />10. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br />WATER BODIES IF THE PROPOSED BMPS FAIL. <br />11. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO <br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS <br />FROM MAY 1 THROUGH SEPTEMBER 30. <br />C-1 <br />AIL 30, 2021 <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY DEFT, DATE <br />DRAWN <br />B. Srebro <br />CHECKED <br />B. Srebro <br />ENGINEER <br />B. Srebro <br />DATE SUBTITLE <br />12.06.19 <br />12.06.19 <br />GENERAL CIVIL NOTES <br />TITLE <br />12.06.19 <br />PIW UPGRADES ADDENDUM A <br />CHECKED <br />B. Leslie <br />12.06.19 <br />APPROVED <br />Al <br />51 <br />0 s tts <br />�k <br />CIVIL I STRUCTURAL I SURVEY <br />4815 CENTER STREET I TACOMA, WA. 98409 <br />PHONE: (253) 474-9449 I FAX: (253) 474-0153 <br />http://wvvw. sittsh i ll. corN <br />Project No.: 17659 Project Mgr.: BKL <br />Proj. Engineer: SDS Proj. Drafter: JDK <br />N , ­ - i <br />E <br />1' Y, I� ��� <br />01.25.21 <br />CIVIL <br />EVERETT, WA I III NO. 4.0®YD-C2C <br />