Laserfiche WebLink
GENFfiPJ_ NOTES <br />1-1 /2" CW <br />INSTALL CLEVIC <br />HANGER AT <br />BASE OF RISER <br />199 CW- <br />1 " PW 0 N TO <br />TOP OF SILL - <br />WALL WITH BALL <br />VALVE AT 4x4x1 <br />BRANCH TEE <br />99 PW AT TOP <br />OF SILL WALL <br />m <br />L"m <br />1.25 <br />1.5 <br />i i I <br />6" P.P.W. <br />1 " CW 1 <br />o oo <br />ALIGNEDPIW LINES Pl <br />VERTICAL ABOVE I <br />:t <br />WALL & DTWN WALL <br />( � 0- <br />1 M'l 661 M452001 <br />� J o 'I 0 'I l <br />FIRST FLOOR PLAN <br />SCALE: 1 /"®19®099 <br />2025 <br />2q5 <br />2075 <br />SEE S T. 1 M 164 <br />�1 " PW <br />1" CAPPEO r <br />3" CW <br />VALVE <br />103C5 <br />I <br />16C2 <br />3 <br />e <br />s <br />,�s-�_.a�.,��: .,>.,- .a. ., �. -.� w,.:. ,...., ex:.a..us....a.s,�.u.�r.�L.�:3 rr� ,.�.+micas-a::cxa::.:zrz���c��+�x*.�-nsrr�.sis:-2.;��� .,,zf. �g•�, <br />rt <br />.off I R i $ i <br />C <br />CA <br />CONSTRUCTION NOTES <br />1� INSTALL NEW PIPING, VALVES, FITTINGS AT POC'S FOR <br />(E) PUMPS P7 & P8. <br />SEE ENLARGED PLAN 452-02 AND P&ID M355 FOR <br />DETAILS. MAINTAIN WATER SUPPLY PIPING TO PUMPS. <br />INSTALL NEW PIPING TO ADJACENT PLENUM WALL. <br />ALIGN MOTORIZED CONTROL VALVES TO MINIMIZE <br />INTRUSION INTO SPACE. <br />3, ROUTE PIW PIPING ALIGNED VERTICALLY ABOVE <br />PRECAST MALL AND BETWEEN SIDING AND COLUMNS. <br />4• ALL STRUT TYPE PIPE SUPPORTS AND COMPONENTS <br />SUCH AS CLAMPS, BASES, AND BOLT; SHALL 6E 304L <br />S5. <br />5• GIRDER SUPPORTS AND 4" HSS TUBE SUPPORTS <br />SHALL BE COATED CARBON STEEL PER STRUCTURAL <br />DRAWINGS. <br />