Laserfiche WebLink
STEP 3. COMPLETE MINIMUM REQUIREMENTS #1-5 <br />The following subsections address MR #1-5. The more information provided in these subsections typically <br />corresponds to faster review and permit issuance times. Submitted checklists that lack the necessary <br />information for review are considered incomplete and will be returned unprocessed to the applicant. <br />MR #1: Preparation of Stormwater Site Plan <br />The purpose of MR #1 is to convey all relevant information about the proposed project to the City for review <br />to ensure the project is in compliance with the current City and State stormwater management standards. <br />This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br />significant and insignificant aspects of the project with regards to stormwater management. <br />Task 1: Describe existing site conditions <br />Provide description of existing site conditions: <br />Backyard: Grass / moss / dirt <br />Describe existing structures (location, type): <br />Garage is 25' from the sidewalk and about 40' from rear property line. <br />Describe slopes on your site (flat, rolling, steep, %): <br />property is higher than the street slightly. Driveway slopes toward the street. Side yards <br />are flat or sloped toward the front. Backyard is naturally sloped toward the house but is <br />about 60 feet from wood creek ravine which is steeply sloped away from the house. <br />Describe hard surfaces (roof, ground treatment): <br />Installing paver patio in back yard and pathways on side and front in addition to replacing <br />the driveway. <br />Describe vegetative surfaces (location, quanity ft2): <br />flower beds next to pavers and grass in front. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 4 <br />